SL Home Services

General Contractor - Buffalo, NY

Average rating

info

4.87

4.9

based on 6 online reviews

Average rating

info

4.87

4.9

based on 6 online reviews
based on 6 ratings

Project Gallery

A table showing the projects done by the pro

Photo

Project

Date

Description

Cost

Home

Picture Frame Hanging

Mar 2015

Customers needed their son's collection of horror movie posters and shadow boxes hung in their basement.

$125

Buffalo, NY

Bathroom Remodel

Feb 2015

The price above was a labor price because the customer already had all her supplies for her bathroom remodel. We removed the floor, old vanity, medicine cabinet, and light bar. We had to plaster repair much of the drywall and add 3/8" plywood to the subfloor for extra support. After it was primed and painted we installed the new tile, new vanity, medicine cabinet, and light bar. We also routed and installed 5 upstairs doors that are not in the pictures.

$2k

Youngstown, NY

Bathroom Remodel

Jan 2015

Replacement of floor tile, shower surround, toilet, vanity, and all associated fixtures.

$8k

Lewiston, NY

Burst Pipe Water Damage Repair

Jan 2015

A pipe burst that was located above the bathroom and stairwell while the homeowners were out of town. Flooding ensued and several areas were badly damaged including the downstairs bathroom, the stairwell to the basement, and the hardwood floors of the bathroom, living room, and foyer.

$15k

Youngstown, NY

Dining Room Painting

Jan 2015

a freshly constructed addition with new drywall needed to be primed and painted. The ceiling was 12ft on one side and sloped down to 8ft. The entire room was primed with Killz followed by two coats of paint on the walls and ceiling.

$400

Youngstown, NY

Niagara Falls House Paint

Nov 2014

Painted several rooms of a newly purchased home.

$2k

Niagara Falls, NY

Grand Island Popcorn Ceiling Removal

Oct 2014

Removal of popcorn ceiling, Repainted ceiling and walls, installed new lights

$3k

Grand Island, NY

Youngstown House Paint

Aug 2014

House had lots of peeling paint and mildew accrual. We powerwashed, bleached the mildew, scraped remaining loose paint, primed all bare wood spots, and then painted 2 coats with Sherwin Williams Duration.

$3k

Youngstown, NY

Lake Ontario Deck

Jun 2014

A man had a very unsafe pathway to the bottom of the embankment to the lake. We built him an infinity deck above the tier and a custom built 55 step set of stairs to safely walk down.

$10k

Youngstown, NY