Remodeling Contractor - Clayton, IL
We are a family owned and operated general contractor business. Our business has been registered since 2002, and we have done construction for several years prior to registering our business. We strive for quality over quantity.
Address
300 E Lafayette St
Clayton, IL 62324
Photo | Project | Date | Description | Cost | Home |
---|---|---|---|---|---|
garage roof replacement | Oct 2014 | removed entire framing of existing garage roof; reframed, resheeted, and shingled roof. installed new soffit, facia, and gutters. | Quincy, IL | ||
fireplace room addition to house | May 2014 | framed and enclosed an addition to back of house, attaching roof into existing roof of house, on existing concrete patio. wired for lights, and outlets. constructed a fireplace chase for wood burning fireplace. covered chase with faux stone product. installed wood car siding on ceiling and walls. | Camp Point, IL | ||
burned out apartment | Dec 2012 | gutted out burned out 1 br. apt; closed off overhead door opening; converted garage into 2 br's; changed former br/lr/kit into open concept lr/kit area. | Quincy, IL | ||
burned out apartment | Dec 2012 | Gutted out burned out 1 br. apt.; closed in overhead door opening and converted garage into 2 br's; opened up former br./lr./kit into an open concept lr/kit area. | Quincy, IL | ||
mobile home rebuild after tree fell on it | Dec 2011 | Removed debris, reframed 2 walls, reframed partial ceiling/roof, reinsulated, rewired bathroom, replaced subfloor, installed drywall, 2 new windows, primed and painted drywall, installed new metal on roof. | Camp Point, IL | ||
horse barn | Oct 2009 | Constructed a 75' wide x69' deep x 35' tall horse barn. Paddock area leading to 5 stalls leading to center alley, and into tack area. 15' equipment storage area. A 15' x60' loft over the stables, a 15' x 60' loft over center alley, and a 15' x 30' loft over tack area. | Camp Point, IL | ||
partial bathroom renovation | Feb 2015 | removed old surround, drywall and tub. removed old subfloor. removed old stool, vanity and top. repositioned tub plumbing to allow for new tub and surround. updated stool supply pipe and vanity valves. installed drywall and FRP panel above surround. Installed new vinyl laminate flooring. Installed new toilet. Installed new vanity. | Quincy, IL | ||
stairwell upgrade | Feb 2015 | removed old plaster and lath from walls. framed for lower ceiling line. found outdated wiring issues. customer contacted electrician to solve issues. framed to cover old window. drywalled and taped , mudded and sanded. installed new wire shelving against end wall and storage rail with various devices for different hanging storage. installed new light in ceiling. | Quincy, IL | ||
new range hood | Jan 2015 | removed old range hood, modified existing wall paneling to fit new hood. installed new hood and installed trim to finish. | Quincy, IL |