Doug Meier (Meier Construction)

Carpenter - Enid, OK

5.0

1 review

5.0

1 review

Project Gallery

A table showing the projects done by the pro

Photo

Project

Date

Description

Cost

Home

Classroom Remodel

Jun 2015

In this project we started by tearing out the old suspended ceiling and insulation, removing the carpet, and removing existing wall furnishings. Then had all of the electrical redone and a new suspended ceiling installed. My involvement was primarily in the flooring and finish work. I removed the existing carpet adhesive from the concrete sub-floor and laid new 24"x24" carpet tiles with a transition to the existing floors surrounding the room. I also skim coated the cinder block walls to prep them for a knock-down texture and paint. I installed new audio and projection systems for teaching purposes, and hung a new 10' white board in place of the old chalk board.

$1

Enid, OK

Retaining Wall

Jun 2015

This project included ground prep work and installation of an aggregate leveling pad followed by erecting a keystone retaining wall to control erosion.

$3k

Garber, OK

Shower Remodel

Mar 2015

This project was a complete shower remodel and bathroom floor tile replacement. I stripped everything down to bare studs and concrete floor. I raised the shower ceiling and lowered the curb, and then I formed the pan, lined it, installed backer board, formed a mud tile base, and proceeded to re-tile the shower with a corner shelf and decorative inset.

$2k

Enid, OK

Oklahoma Bible Academy Carpet

Jan 2015

This project included old carpet removal, floor preparation, and installation of new carpet tiles and vinyl cove base. The area of this install was a little over 2200 square feet and included multiple doorway cuts and angled walls.

$3k

Enid, OK

Bathroom Remodel

Sep 2015

In this project I was responsible for taping and texturing all drywall and completing all tile work in the shower, around the tub, and on the floor.

Enid, OK

Closet Expansion

Aug 2015

This project involved demolishing a couple of walls to expand a small bedroom closet into an existing space previously used as a hall linen cabinet. Services provided in this project included demolition, framing, drywall installation and finishing, finish carpentry, door hanging, hardwood floor installation, and painting.

Enid, OK

Garber New House Construction

Jan 2015

This is an on-going project that has included: Cypress Lap-and-Gap siding installation, Concrete forming, and ground prep, Trim and Finish work, Cedar patio railing with aluminum arch balusters, Cultured Stone siding installation, Door installation...and more

Garber, OK

Hardwood Floor Install

Jul 2014

3500 square feet of tongue and groove hardwood flooring installed in a two story office building.

Enid, OK

Old Shed Renewal

Jun 2014

This project involved re-roofing an old shed with corrugated tin and repainting the exterior in tandem with another contractor.

Pond Creek, OK