General Contractor - Geneva, IL
We are a small family business established in 1985. We do all types of residential carpentry, and remodeling. We take pride in a job well done, and I believe that shows in our work. Although we have a small web presence, 99% of our work is word of mouth and repeat business. We do our best to maintain straightforward communication with our customers, and give them what they are looking for, with a price that is reasonable. In this fashion, we turn customers into clients. We are not the fastest or the cheapest, but we do quality work. People have been telling their friends and family about us since 1985!
Address
1144 E State St Ste A
Geneva, IL 60134
Photo | Project | Date | Description | Cost | Home |
---|---|---|---|---|---|
Jones Bathroom | Oct 2013 | This was a complete gut. Demo down to framing, replaced portions of sub floor, and all the insulation. | $9k | Geneva, IL | |
Carmelite Gazebo | May 2013 | New custom gazebo timber framed with cedar beams, and trimmed out with Azek PVC. | $72k | Darien, IL | |
Ron Sunroom | Jan 2013 | Carpenter ants ate the bottom three feet of these folks 3 season room. So, we removed all the window units carefully. Then we removed all the siding framing, and posts. After which, we re framed, resided, re stained, and reset the window units. | $2k | Sugar Grove, IL | |
Marilynn floors, trim, and paint | Jan 2013 | This project we took a house in 1985 original finish, and updated the flooring, trim, and paint. New red oak flooring custom stained and finished with Bona Traffic. New Slate entries, front and back, in a multicolor Versailles pattern. New oak base and shoe custom stained to match floor. New paint in main living area, entry way, stairway, and upstairs hall. | $11k | Geneva, IL | |
Jamie basement | Jan 2012 | This was a complete basement build out, which included a very nice bathroom. The plumbing was roughed in by the builder during construction. The rest of the basement received a pretty basic finish. | $17k | Geneva, IL | |
Nate Bathroom | Jan 2011 | We completely gutted this bathroom. We even replaced much of the sub-floor, and all the insulation. The customer provided the vanity, medicine cabinet, toilet, and tile. We provided all the construction materials and labor. Some plumbing was upgraded from cast to PVC, and the electric was upgraded as well. | $5k | St Charles, IL | |
Jones bookcase | Jan 2010 | These peoples daughter is a reading machine. She loves books and has many. Her room also has limited space for additional loose bookcases. We worked together to come up with a quick concept sketch, and this is what we ended up with. | $2k | Geneva, IL | |
Ed Gazebo | Jan 2010 | This was a custom gazebo built from the ground up. It's made from pressure treated lumber and cedar. This is not a kit. All the openings had a spline groove cut into the frames, so that screens could easily be installed or removed. | $8k | Saint Charles, IL |