Allmark Construction

Handyman - Idaho Falls, ID

Project Gallery

A table showing the projects done by the pro

Photo

Project

Date

Description

Cost

Home

South Falls Bathroom Remodel

Jun 2014

I installed the vanity then the counter top then I tiled then the back splash, also on the sides if the vanity, I put tile on both sides.. The job cost labor and material $1200

$1k

Idaho Falls, ID

Drywall/Door Installation

May 2014

Framed two walls with drywall and installed interior door--NOT going to mud/tape or paint, that is being subbed out. Once paint is done, going back to install the trim.

$400

Idaho Falls, ID

Bathroom Countertop

Mar 2014

- changed counter top from wood to Travertine - also added shelf edge

Idaho Falls, ID

Complete Bathroom Remodel

Feb 2014

- took out old vinyl floor and put in tile - replaced toilet - replaced sink

Idaho Falls, ID

Deck Addition

Jan 2014

- free-standing deck, not attached from the house - 3/16 inch wood out of the square - custom detail on handrail - 10ft x 15ft deck

Ammon, ID

Kitchen Backsplash

Dec 2013

- took out range - put down 1 x 1 for support - applied slate backsplash pieces

Idaho Falls, ID