Failla's Flooring Solutions, LLC

Flooring Contractor - Imperial, MO

Average rating

info

4.57

4.6

based on 7 online reviews

Average rating

info

4.57

4.6

based on 7 online reviews
based on 7 ratings

Project Gallery

A table showing the projects done by the pro

Photo

Project

Date

Description

Cost

Home

Project #103

Mar 2019

We took up 380 sqft of existing ceramic tile, cement board underlayment, and previous vinyl flooring and its underlayment. We prepared the subfloor for the new hardwood flooring. The customer had previously installed hardwood in the attached living room, so the new floor, which was the dining room and kitchen, had to be feathered into the old floor. The customer already had all the hardwood purchased and bought the new trims after talking with us. This project took about 4 days from start to finish for myself and one other guy.

$2k

Fenton, MO

Project #108

Feb 2019

The customer purchased all the materials for the project and we transported them to his home. We began by taking up a vinyl composite tile throughout the kitchen, dining room, mudroom and bathroom on the main level of the home. There were two additional bathrooms upstairs that we prepped for the new flooring. We put down cement board underlayment, then installed 12 x 24 porcelain tiles in a brick pattern. The project was about 600 sq ft and took just over a week to complete with just myself and one worker.

$3k

Manchester, MO