Top 1 Dock Building & Repair Contractors in Mount Pleasant, WI
Top questions to ask before hiring a dock building & repair contractor
A professional will assist you with scope and estimates, but having a clear idea of what you want to accomplish will help communication.
Do you want professionals to do everything, or do you have the time and skill to do some of the work?
Many projects such as have a DIY component, such as painting or cleanup.
First and foremost, protect yourself and make sure the contractor and any sub-contractors are licensed, bonded and insured.
Latest projects near Mount Pleasant
Recent projects booked on Porch
Franksville 53126
Deck Construction
Service needed
Deck Construction
Deck Construction
Start Date
I'm flexible
I'm flexible
Racine 53405
Deck Construction
Start Date
Within a month
Within a month
Existing deck
No
No
Approximate size of deck to build
100-250 sq ft
100-250 sq ft
Decking and railing materials
I'm not sure
I'm not sure
Deck features
Stairs
Stairs
Other deck features
No, thanks, just the deck
No, thanks, just the deck
Extent of design or prep work
No
No
Sturtevant 53177
Deck Construction
Start Date
Within a month
Within a month
Service requested
Build new deck
Build new deck
Plans, drawings, or blueprints
No, but I know what I want.
No, but I know what I want.
Deck size (SQFT)
500 to 1000 square feet
500 to 1000 square feet
Surface and railing material
Wood
Wood
Deck structure material
Wood
Wood
Structural features
Structural support for hot tub
Structural support for hot tub
Supplemental additions
Something else
Something else
Material provided
Yes, I just need construction
Yes, I just need construction
Racine 53403
Deck Construction
Start Date
I'm flexible
I'm flexible
Service requested
Build new deck
Build new deck
Plans, drawings, or blueprints
Yes, I have design plans.
Yes, I have design plans.
Deck size (SQFT)
100 to 250 square feet
100 to 250 square feet
Surface and railing material
Looking for advice
Looking for advice
Deck structure material
Wood
Wood
Structural features
Something else
Something else
Supplemental additions
Something else
Something else
Material provided
No, pro must provide the materials
No, pro must provide the materials
Racine 53403
Dock Construction
Start Date
Within 48 hours
Within 48 hours
Preferred size of dock
200-400 sq ft
200-400 sq ft
Kind of dock
Standing
Standing
Location of dock
River
River
Location characteristics
Soft or muddy bottom
Soft or muddy bottom
Extent of design prep
Yes, I have sketches and a basic idea of what I want
Yes, I have sketches and a basic idea of what I want