Top 10 slope stabilization services in Oakland, CA
Slope Stabilization
Serves Oakland, California
Top questions to ask before hiring a slope stabilization contractor
A professional will assist you with scope and estimates, but having a clear idea of what you want to accomplish will help communication.
Do you want professionals to do everything, or do you have the time and skill to do some of the work?
Many projects such as have a DIY component, such as painting or cleanup.
First and foremost, protect yourself and make sure the contractor and any sub-contractors are licensed, bonded and insured.
Recent reviews for Oakland slope stabilization contractors
Just talked over the phone, he didn't ask to come and measure the location of the structure that I wanted to build. I personally felt he wasn't interested in the project.
All slope stabilization contractors in Oakland, CA
Latest projects near Oakland
Recent projects booked on Porch
Oakland 94602
Slope Stabilization
Start Date
Within a year
Within a year
Erosion control service needed
Slope, cliff or bank stabilization
Slope, cliff or bank stabilization
Slope percentage grade
More than 45%
More than 45%
What is adjacent to slope
Section of yard or landscaping, River, lake or other water frontage, Fencing
Section of yard or landscaping, River, lake or other water frontage, Fencing
Slop surface material
Dirt and soil
Dirt and soil
Recent mud, rock or landslide
No
No
Orinda 94563
Slope Stabilization
Start Date
Within a week
Within a week
Erosion control service needed
Slope, cliff or bank stabilization
Slope, cliff or bank stabilization
Slope percentage grade
20-30%
20-30%
What is adjacent to slope
Storm drain
Storm drain
Slop surface material
Dirt and soil
Dirt and soil
Recent mud, rock or landslide
No
No
Oakland 94619
Slope Stabilization
Start Date
Within a month
Within a month
Erosion control service needed
Slope, cliff or bank stabilization
Slope, cliff or bank stabilization
Slope percentage grade
More than 45%
More than 45%
What is adjacent to slope
Section of yard or landscaping
Section of yard or landscaping
Slop surface material
Dirt and soil
Dirt and soil
Recent mud, rock or landslide
No
No
San Leandro 94577
Slope Stabilization
Start Date
Within 48 hours
Within 48 hours
Erosion control service needed
Slope, cliff or bank stabilization
Slope, cliff or bank stabilization
Slope percentage grade
More than 45%
More than 45%
What is adjacent to slope
Section of yard or landscaping, Fencing
Section of yard or landscaping, Fencing
Slop surface material
Dirt and soil
Dirt and soil
Recent mud, rock or landslide
Yes
Yes
Berkeley 94708
Slope Stabilization
Start Date
Within a month
Within a month
Slope percentage grade
More than 45%
More than 45%
What is adjacent to slope
Section of yard or landscaping, Home or other building
Section of yard or landscaping, Home or other building
Slop surface material
Dirt and soil
Dirt and soil
Recent mud, rock or landslide
Yes
Yes
Oakland 94611
Slope Stabilization
Start Date
I'm flexible
I'm flexible
Erosion control service needed
Slope, cliff or bank stabilization
Slope, cliff or bank stabilization
Slope percentage grade
30-45%
30-45%
What is adjacent to slope
Section of yard or landscaping, Home or other building
Section of yard or landscaping, Home or other building
Slop surface material
Dirt and soil
Dirt and soil
Recent mud, rock or landslide
No
No