Remodeling Contractor - Peck, MI
Average rating
5.00
5.0
Average rating
Established in 2006, MI-Builder is a distinguished family-owned enterprise specializing in remodeling services. Boasting an impressive tenure, our expertise spans a wide spectrum- from executing minor repairs to undertaking comprehensive remodeling projects to New Homes With two locations Peck and Troy MI. Our comment on excellence and dedication to our craft has solidified our reputation as one of the leading remodelers in the region. Our team takes immense pride in tailoring solutions that cater to the unique needs of our clients, ensuring quality and satisfaction at every turn
Average rating
Andy J.
This is the third time I have use MI-Builder and I have been happy with them all three times. The end product has turned out beautifully each time. I also appreciate how well they communicate throughout the process. I will use them again and recommend them to others.
John S.
Very professional, worked everyday from start to finish. Extremely clean. Workmanship was outstanding. I would highly recommend MI- Builder
Address
137 E Lapeer St
Peck, MI 48466
Photo | Project | Date | Description | Cost | Home |
---|---|---|---|---|---|
Shower | Jan 2023 | Remove tub Install Delta new shower enclosure with seat 36" x 60" New Delta shower door New 36" vanity New toilet new linoleum floor | $9k | Brown City, MI | |
bathroom | May 2022 | Complete bathroom remodel Remove window in tub /shower area Install exhaust vent New shower valve New drywall New Paint Install new vinyl shower base Install niche were window was Tile walls and floor New hanging sink | $10k | Brown City, MI | |
Kitchen Remodel | Apr 2022 | Homeowner wanted to update the kitchen by removing wall between kitchen and living room giving them the open concept feel. Install new Anderson 6' sliding door for easy access to deck. Install new Kraftmaid kitchen cabinets with quartz countertops and tiled backsplash. new flooring, drywall, painting and trim. | $39k | Riley, MI | |
Bathroom Remodel | Jun 2021 | Customer wanted a curb less 6' x36" shower with seat> (Delta) multi shower heads with rainfall, heated tiled floors. Kraftmaid 6' vanity > Quartz top with two sinks. New drywall, trim, paint, custom hinged shower door. | $35k | Fort Gratiot, MI | |
Shelda (Bathroom) | Oct 2019 | This full bathroom remodel was performed over the course of two weeks. For this project, the homeowner requested for the completion of: Complete demo of the bathroom down to the studs and sub-floor to allow access for new plumbing and electrical. Plumbing: move toilet , rough in new soaker tub, shower drain, vanity drain, all new water supply lines. New dual shower valve,vanity fixture, soaker tub with floor valve. Electric: 2 wire feeds to Electric panel box on new breakers for the 5 new gfci outlets (plugs) 1 new hanging chandelier, new exhaust fan with light, 2 wall vanity lights. HVAC: relocate existing heat register in ½ wall to adjacent wall. Remove & Re frame new barn opening 30” existing to 36” finish opening. Install backer for grab bars and towel bars. Frame in 3 window niche , 1 seat in new shower. Frame in new shower floor for curbless shower. Moisture resistant drywall Prime & Paint - 3 color Tile shower & floor areas Trim: Install Barn door, base mouldings, window & door casing | Grand Blanc, MI | ||
Don's Bath Remodel | Jun 2019 | This full bathroom remodel was performed over the course of one week. For this project, the homeowner requested for the completion of: Complete demo of the bathroom down to the studs and sub-floor Frame in shower wall ¾” plywood tongue & groove on floor Rough in new exhaust fan vented to exterior Electric: dedicated plug outlet to electric circuit breaker panel box, wire in with switch for exhaust fan, relocate vanity light, relocate gfci outlet plug. Plumbing: new water supply lines for shower, vanity & toilet. Relocate drain for vanity, new water shut off valves , shower & vanity fixture, toilet Insulation Shower with sliding door Moisture resistant drywall Tile floor Trim: door, base moldings, window & door casing | 0 | Almont, MI | |
Andy & Liz ( Bathroom ) | Apr 2019 | This full bathroom remodel was performed over the course of 11 days. For this project, the homeowner requested for the completion of: Complete demo of the bathroom down to the studs and sub-floor to allow access for new plumbing and electrical. Frame in shower walls, seat and window niche, frame in new shower floor for curbless shower. Plumbing: move toilet , rough in new shower, shower drain, vanity drain, all new water supply lines. New dual shower valve,vanity fixture, Electric: 2 wire feed to Electric panel box on new breakers for the 4 new gfci outlets (plugs) , radiant floor heat, 1 new vanity light, new exhaust fan with light. Install backer for grab bars and towel bars, hanging vanity, wall cabinet & medicine cabinet. Insulation Moisture resistant drywall Prime & Paint - 2 color Tile shower & floor areas Install vanity,medicine & wall cabinets Tile backsplash Trim: door, base mouldings & door casing Install plumbing fixtures Finish electrical. switches, plugs and covers. | Macomb, MI |