Top 6 Concrete Contractors in South Portland, ME
Top questions to ask before hiring a concrete contractor
A professional will assist you with scope and estimates, but having a clear idea of what you want to accomplish will help communication.
Do you want professionals to do everything, or do you have the time and skill to do some of the work?
Many projects such as have a DIY component, such as painting or cleanup.
First and foremost, protect yourself and make sure the contractor and any sub-contractors are licensed, bonded and insured.
Recent reviews for South Portland Concrete Contractors
Very professional and prompt! Needed a leachfield installed as mine had failed and Justin was able to move his schedule around to accommodate me. He and his crew did an amazing job.
Latest projects near South Portland
Recent projects booked on Porch
South Portland 04106
Pavers Installation
Start Date
Within a year
Within a year
New construction or repair of existing
Build or install something new
Build or install something new
Hardscape item
Pavers, sidewalks or pathways
Pavers, sidewalks or pathways
Where to install pavers
Sidewalk or pathway
Sidewalk or pathway
Existing sidewalk or pathway to remove
Yes
Yes
Length of sidewalk or pathway
50-100 feet
50-100 feet
Type of pavers
Slate or other natural stone
Slate or other natural stone
Westbrook 04092
Grading
Start Date
Within a month
Within a month
Grading project purpose
Grade land to improve drainage
Grade land to improve drainage
Size of grading area
Under 1,000 sq ft
Under 1,000 sq ft
Items needing to be removed first
No
No
Underground utility survey already condcuted
I'm not sure
I'm not sure
Grading area topography
Slight slope
Slight slope
Soil needing to be hauled to or away from site
I'm not sure
I'm not sure
Portland 04102
Grading
Start Date
I'm flexible
I'm flexible
Grading project purpose
Grade land to improve drainage
Grade land to improve drainage
Size of grading area
Under 1,000 sq ft
Under 1,000 sq ft
Items needing to be removed first
No
No
Underground utility survey already condcuted
I'm not sure
I'm not sure
Grading area topography
Slight slope
Slight slope
Soil needing to be hauled to or away from site
Yes, soil will be hauled to the property
Yes, soil will be hauled to the property
Portland 04106
Grading
Start Date
I'm flexible
I'm flexible
Grading project purpose
looking to turn aria into garden aria
looking to turn aria into garden aria
Size of grading area
Under 5,000 sq ft
Under 5,000 sq ft
Items needing to be removed first
No
No
Underground utility survey already condcuted
Yes
Yes
Grading area topography
Flat
Flat
Soil needing to be hauled to or away from site
I'm not sure
I'm not sure
Scarborough 04074
Concrete
Start Date
Within a month
Within a month
Type of work
Major concrete
Major concrete
Kind of concrete work
Delivery
Delivery
Reason
Footing or foundation
Footing or foundation
Square footage
100 - 500 sq ft
100 - 500 sq ft
Need pump truck
No
No
Project status
Ready to hire
Ready to hire
Kind of location
Home/residence
Home/residence
Authorization to make changes
Yes
Yes
South Portland 04106
Grading
Start Date
I'm flexible
I'm flexible
Erosion control service needed
Grading or ground leveling
Grading or ground leveling
Grading project purpose
Grade land to improve drainage
Grade land to improve drainage
Size of grading area
Under 1,000 sq ft
Under 1,000 sq ft
Items needing to be removed first
Shed or other outdoor structure
Shed or other outdoor structure
Underground utility survey already condcuted
I'm not sure
I'm not sure
Grading area topography
Slight slope
Slight slope
Soil needing to be hauled to or away from site
I'm not sure
I'm not sure
Westbrook 04092
Pavers Maintenance
Start Date
I'm flexible
I'm flexible
Structure type
Deck, patio or porch
Deck, patio or porch
Repair item
Patio
Patio
Construction material
Brick, stone or other pavers
Brick, stone or other pavers
SQFT of damaged area
50-100 sq ft
50-100 sq ft
Repair issues
Cracked or damaged bricks, stones or pavers
Cracked or damaged bricks, stones or pavers
Westbrook 04092
Pavers Maintenance
Start Date
I'm flexible
I'm flexible
New construction or repair of existing
Repair existing hardscape
Repair existing hardscape
Hardscape repair item
Sidewalk or pathway
Sidewalk or pathway
Construction material
Brick, stone or other pavers
Brick, stone or other pavers
SQFT of damaged area
100-200 sq ft
100-200 sq ft
Repair issues
needs to be leveled and moved over 10 in
needs to be leveled and moved over 10 in