Remodeling Contractor - Stockton, CA
Address
5948 Gettysburg Pl
Stockton, CA 95207
Photo | Project | Date | Description | Cost | Home |
---|---|---|---|---|---|
Sunnyside rebuild Rubinger investments llc | Aug 2011 | saved owner over 50k fire damaged 3br attached garage architecture inspections complete rebuild jack house to shape | $56 | Stockton, CA | |
Train building Annette | Oct 2010 | manage an d build boutique wemens clothing store. Remodel interior exterior install elevator paint and install all items needed for store | $45k | Stockton, CA | |
clarane remodel Annette | Sep 2010 | remodel kit/baths rear deck every room face-lift | $28k | Stockton, CA | |
residence Annette | May 2009 | stucco wall 6' around property Arch electric gates | $3k | Stockton, CA | |
BERKELEY APT BUILDING | Apr 2008 | REDESIGN 3RD FL. (AUP) CITY PLAN CREATION AND BUILD. CREATE NEW ADDITION 3RD FL. TURN INTO 3 UNITS EXTERIOR PAINTING PORCH REBUILD NEW ELECTRICAL 5 SUB PANELS NEW CIRCUITS LOAD CALCULATIONS KITCHEN AND BATH REMOD ALL FLOORS CRIPPLE WALL REINFORCEMENT BSMT/CRAWL SPACE | $25k | Berkeley, CA | |
SEQUOIA WOODS COUNTRY CLUB @ HOLE 15 ON COURSE | Aug 2004 | work with engineer and architect design custom mountain home. new everything 400a power new plumbing new addition remove existing ceiling and framing living room raise to 16' punch through roof creating loft area with stairs re design rooms custom kitchen and baths custom deck rear utility deck at service ext. finish 2nd half lower level creating office with project/tool area. custom ext. siding and trim all new windows and doors. circular and winding stairs covered in exotic hardwood. | $45k | Arnold, CA | |
SHRADER ST APT BUILDING | May 2003 | PAINT BUILDING FRONT BACK REMODEL 2 STORY UNIT REAR REMODEL KITCHEN GRANITE COUNTER BATH REMODEL WOOD FINISHING STAIR BUILDING STAIR REPAIR ROOF DRAIN SERVICE DOOR WINDOW LOCKS | $5k | San Francisco, CA | |
SHRADER ST HOME | Aug 2002 | REAR EXT PROJECTS PAINT REAR | $1k | San Francisco, CA | |
RAMONA AVE UNIT 3-4 | Jun 2001 | 1 YEAR PRIOR REPAIR SERVICE FIRST TOTAL REMODEL MAJOR WORK NEW SERVICE ENTRANCE REMODEL UNIT 4 REBUILD UNIT 3 (2) BATH REMODEL (3) KITCHEN REMODEL HARDWOOD FLOORING DOOR AND WINDOW REAR DECK WORK SEWER REBUILD STRUCTURAL REPAIR JACKING INTO SHAPE | $57k | San Francisco, CA |