Top 10 hardwood flooring installation services in Troy, MO
Costs to Install a Prefinished Hardwood Floor
Top questions to ask before hiring a hardwood floor installer
A professional will assist you with scope and estimates, but having a clear idea of what you want to accomplish will help communication.
Do you want professionals to do everything, or do you have the time and skill to do some of the work?
Many projects such as have a DIY component, such as painting or cleanup.
First and foremost, protect yourself and make sure the contractor and any sub-contractors are licensed, bonded and insured.
Recent reviews for Troy hardwood floor installation services
Very Professional, and Prompt. They replaced the roof on our home after the Good Friday Tornado. They did an awesome job, contractor described everything that they would do from beginning to end and followed through. They even took care of the phone c...
Took my money and never came back out to complete my job, now I call and call and get no answer! Scam business beware!
Clint is very amazing, thank you for all your hardwork!
These are the low points of our experience with Epik: 1) When they remodeled our bathroom, they didn't waterproof the shower properly. It leaked from Day 1. They also installed shower plumbing in the exterior wall, instead of building a chase for the pl...
Very helpful and knowledgable quality work and fair prices. I would recomend him to anyone!
Ron Hamilton owner of ST. LOUIS BUILDING SYSTEMS is a fraud, liar, and a thief. I hired him and signed a contract July 25, 2017 to build a 30x50 barn with12x50 and 10x50 porches on both sides. It is now October 25, 2018 and my barn is nowhere near finishe...
Ron Hamilton owner of ST. LOUIS BUILDING SYSTEMS is a fraud, liar, and a thief. I hired him and signed a contract July 25, 2017 to build a 30x50 barn with12x50 and 10x50 porches on both sides. It is now October 25, 2018 and my barn is nowhere near finishe...
She said it would be a 3 week job in September. We are now in November. My bathroom is 1/3 of the way done. She has not given me the supplies she bought with my first payment of $2500. I have paid her approximately $3500 at this point. I do not have the t...