General Contractor - Visalia, CA
5.0
I have been in general contracting since 1980, first in the family business in and around the central valley and now in my business serving Central and Southern Ca. Coming up thru the business I have completed numerous successful projects as listed on my website. Please visit www.rlcrawfordconstructorsinc.com for more information.
Robert Crawford jr
I needed a Contractor to get in and get things done. RL Crawford Constructors was given charge to complete my Condo and retail store and completed both in my timeframes to my complete satisfaction. PG.
Robert Crawford jr
A very professional Contractor that performs. Robert took care of everything from my idea of what I needed to the final. Rod H.
Address
31295 Road 144
Visalia, CA 93292
Photo | Project | Date | Description | Cost | Home |
---|---|---|---|---|---|
Onyx Apts Parking Area Storage | Apr 2018 | Los Angeles mandated that all new apartment buildings be required to install tenant storage. This owner chose to install units in their lower parking lot | $45k | Glendale, CA | |
Garage and storage building for Mr Rod Howard | Dec 2017 | Mr Howard came to me with a need for storage. After a few meetings it was decided to provide Rod with a steel building to suit the area that he had to work with and provide a maintenance free structure. In addition, Mr Howard wanted a block wall to replace his aging wood fence. At 250 feet long and 6'6" high he now has the privacy that was desired. LED Wall lighting was provided which accents and provides back yard illumination at night. | $109k | Visalia, CA | |
Souvenir Store Remodel, Hollywood Walk of Fame Mr Paul Goldman | Aug 2017 | All work done between 1am to 8am daily until finished. The $10 store on Hollywood Blvd outgrew the space it was in so the owners were able to expand into adjoining space and grew by another 1/3rd of the existing space. The project included demolition of a separation wall, two large roll up doors, all new flooring (installed last), all new display gondolas, a 6 register point of sale on a platform with all new power and data wiring, new slat wall panels throughout, new led lighting throughout, a new room each for electronics and a life size gold Oscar display and all new wall paint accents. Mr Goldman confirmed increased flow which increased sales. | $100k | Los Angeles, CA | |
Century City Condo for Mr. Paul Goldman | Jul 2017 | A 24th floor complete demo and remodel of a shell at 1600 sq ft. | $1.6m | Los Angeles, CA | |
Doug Bohrer Residence | Dec 2016 | This project involved a complete kitchen remodel in addition to all new wood flooring throughout except the bath rooms and kitchen | $65k | Tulare, CA |