Consolidated Solar Technologies

Solar Energy Service - Albuquerque, NM

Average rating

info

2.59

2.6

based on 34 online reviews

Average rating

info

2.59

2.6

based on 34 online reviews
based on 34 ratings

Project Gallery

A table showing the projects done by the pro

Photo

Project

Date

Description

Cost

Home

Pueblo of Isleta Tribal Services Complex

Apr 2014

CST teamed with ICS-Alternative Energy to design and install over 1,800 solar panels totaling 591.216 kW. The solar array is composed of both a rooftop array and a ground-mount array. Going solar is in alignment with tribal values including environmental and community stewardship, as well as ecologically conscious decision-making.

Albuquerque, NM

Jewish Community Center of Greater Albuquerque

Nov 2011

CST designed and installed a state-of-the-art solar array for the Jewish Community Center (JCC) that helps to offset approximately 50% of annual energy expenses. The 110.4 kW rooftop array consists of 480 SunPower PV modules. Utilizing renewable energy is in alignment with the JCC's mission, "We like working with CST and we love helping to save our environment for future generations," said JCC President Art Gardenswartz.

Albuquerque, NM

Albuquerque International Sunport Airport Solar Array

Jun 2011

Contracted by the City of Albuquerque, CST designed, engineered and installed a large solar array for the Albuquerque Sunport. With 2,496 solar panels mounted atop carport parking structures, the system totals 610.08 kW. This sophisticated solar array also includes a monitoring system that displays the array's performance characteristics and environmental benefits on a kiosk in the Great Hall of the Terminal Building.

Albuquerque, NM

Albuquerque Academy Solar Array

Jan 2011

The Albuquerque Academy is home to a $5 million 1.15 MW solar array - one of the largest arrays on a secondary school in the nation. Consisting of over 5,000 solar panels and supplying approximately 25% of the school's electric consumption, the array saves this non-profit organization over $50,000 per year.

Albuquerque, NM

Raymond G. Murphy VA Medical Center

Oct 2010

In partnership with Mosher Enterprises and Eaton Corporation, CST integrated a total turnkey solar project for the Raymond G. Murphy VA Medical Center, a division of the New Mexico Veterans Affairs Health Care system located in Albuquerque. The scope of the $20 million contract included designing and installing a 3.2 MW solar array; it was the largest commercial installation completed in the state at that time. The array includes carport and roof-mounted modules.

Albuquerque, NM

Tijeras 2014

Mar 2014

Permit Number: BRSP2014-0023 Permit Type: Residential Solar Permit Description: Solar - Solar

$34k

Tijeras, NM

Solar Installation Albuquerque 2014

Mar 2014

Permit Number: BRSP2014-0017 Permit Type: Residential Solar Permit Description: Solar - Roof mounted PV array 36 modules 11.77 Kw.

$60k

Albuquerque, NM

Albuquerque 2014

Feb 2014

Permit Number: BRSP2014-0012 Permit Type: Residential Solar Permit Description: Solar - Roof Mounted PV Solar Array

$65k

Albuquerque, NM

Solar Installation Albuquerque 2014

Jan 2014

Permit Number: BRSP2014-0008 Permit Type: Residential Solar Permit Description: Solar - Roof mounted PV array 3.924 Kw 12 modules.

$19k

Albuquerque, NM