Top 10 construction project management services in Groves, TX
Top questions to ask before hiring a construction management contractor
A professional will assist you with scope and estimates, but having a clear idea of what you want to accomplish will help communication.
Do you want professionals to do everything, or do you have the time and skill to do some of the work?
Many projects such as have a DIY component, such as painting or cleanup.
First and foremost, protect yourself and make sure the contractor and any sub-contractors are licensed, bonded and insured.
Recent reviews for Groves construction management companies
Great experience with Riq and his team at Gold Medal Builders. They've completed both a master bathroom remodel to make it handicap accessible, as well as replaced all siding and shudders on our family home. I fully plan on using them again due to compe...
My Name is Cindy. They remodeled my bath. I own a home in Vidor Texas. It is extremely excellent. I am so proud of my new bath. Thanks Broughe Construction.
My sister used this Company and I was very impressed. I called them for my project and they saved me $4500.00 compared to other Contractors. I am so very glad I did. I highly recommend this Company if you like excellent work and huge savings.
I own a Realtor Company. I was recommended this Company by word of mouth. I do not regret it. They were the best. I saved thousands by using them. They remodeled my business in Houston, TX. It is amazing. Their designs are fabulous. I really recomm...
I used This Construction Contractor and really liked what they did for me. I saved lots of money for sure using them over other Contractors. They do excellent work. They fine tuned everything in my home and made it look new. Lie a newly built home. It's ...
Didn?t show up on the day of the job and I had to go out of my way to retrieve building supplies. Poor communication.
Do not and I repeat, DO NOT, let this man near anything in yoir home. I was dumb enough to listen to the talk ans hired him and paid him half upfront. He was supposed to hang 5 lights, 2 were replacements, 3 installs and change out the plugs and outlets ...