Top 10 slope stabilization services in Lemon Grove, CA
Top questions to ask before hiring a slope stabilization contractor
A professional will assist you with scope and estimates, but having a clear idea of what you want to accomplish will help communication.
Do you want professionals to do everything, or do you have the time and skill to do some of the work?
Many projects such as have a DIY component, such as painting or cleanup.
First and foremost, protect yourself and make sure the contractor and any sub-contractors are licensed, bonded and insured.
Recent reviews for Lemon Grove slope stabilization contractors
Jason responded on the same day I contacted him, and arrived same day to inspect my sprinkler system leak and provided anestimate same day. He was courteous professional and the only sprinkler repair pro I contacted to respond at all. In the future if...
All slope stabilization contractors in Lemon Grove, CA
Slope Stabilization
Serves Lemon Grove, California
Latest projects near Lemon Grove
Recent projects booked on Porch
Spring Valley 91977
Slope Stabilization
Start Date
I'm flexible
I'm flexible
Erosion control service needed
Slope, cliff or bank stabilization
Slope, cliff or bank stabilization
Slope percentage grade
30-45%
30-45%
What is adjacent to slope
Section of yard or landscaping, Driveway, Home or other building, Fencing
Section of yard or landscaping, Driveway, Home or other building, Fencing
Slop surface material
Mixture of rocks and soil
Mixture of rocks and soil
Recent mud, rock or landslide
No
No
San Diego 92114
Slope Stabilization
Start Date
Within a month
Within a month
Slope percentage grade
20-30%
20-30%
What is adjacent to slope
Section of yard or landscaping
Section of yard or landscaping
Slop surface material
Dirt and soil
Dirt and soil
Recent mud, rock or landslide
Yes
Yes
La Mesa 91941
Slope Stabilization
Start Date
Within a year
Within a year
Slope percentage grade
30-45%
30-45%
What is adjacent to slope
Fencing, Section of yard or landscaping
Fencing, Section of yard or landscaping
Slop surface material
Mixture of rocks and soil
Mixture of rocks and soil
Recent mud, rock or landslide
No
No
La Mesa 91941
Slope Stabilization
Start Date
Within 48 hours
Within 48 hours
Erosion control service needed
Slope, cliff or bank stabilization
Slope, cliff or bank stabilization
Slope percentage grade
20-30%
20-30%
What is adjacent to slope
Road
Road
Slop surface material
Dirt and soil
Dirt and soil
Recent mud, rock or landslide
No
No
Spring Valley 91977
Slope Stabilization
Start Date
Within a month
Within a month
Erosion control service needed
Slope, cliff or bank stabilization
Slope, cliff or bank stabilization
Slope percentage grade
30-45%
30-45%
What is adjacent to slope
Home or other building
Home or other building
Slop surface material
I don't really know
I don't really know
Recent mud, rock or landslide
No
No
Spring Valley 91977
Slope Stabilization
Start Date
I'm flexible
I'm flexible
Erosion control service needed
Slope, cliff or bank stabilization
Slope, cliff or bank stabilization
Slope percentage grade
30-45%
30-45%
What is adjacent to slope
Home or other building
Home or other building
Slop surface material
Grass or other small plants
Grass or other small plants
Recent mud, rock or landslide
Yes
Yes
Spring Valley 91977
Slope Stabilization
Start Date
Within a month
Within a month
Slope percentage grade
30-45%
30-45%
What is adjacent to slope
Section of yard or landscaping, Fencing, 2 ft tall cinder block wall with a fence on top of it. 66 ft long
Section of yard or landscaping, Fencing, 2 ft tall cinder block wall with a fence on top of it. 66 ft long
Slop surface material
Grass or other small plants
Grass or other small plants
Recent mud, rock or landslide
Yes
Yes
La Mesa 91941
Slope Stabilization
Start Date
Within a month
Within a month
Erosion control service needed
Slope, cliff or bank stabilization
Slope, cliff or bank stabilization
Slope percentage grade
More than 45%
More than 45%
What is adjacent to slope
Fencing, Near neighbors house/sidewalk. Maybe 6-8’
Fencing, Near neighbors house/sidewalk. Maybe 6-8’
Slop surface material
Some ivy/other succulents and bushes. Some area is granite and some rocky dirt
Some ivy/other succulents and bushes. Some area is granite and some rocky dirt
Recent mud, rock or landslide
Yes
Yes
San Diego 92115
Slope Stabilization
Start Date
Within 48 hours
Within 48 hours
Slope percentage grade
30-45%
30-45%
What is adjacent to slope
Section of yard or landscaping
Section of yard or landscaping
Slop surface material
Mixture of rocks and soil
Mixture of rocks and soil
Recent mud, rock or landslide
No
No