Texas Studs Carpentry

Remodeling Contractor - McAllen, TX

Project Gallery

A table showing the projects done by the pro

Photo

Project

Date

Description

Cost

Home

Bank of America Drive Thru Banking Facility

Oct 2013

Material, labor and equipment required for the reconstruction of 32'-0" wide x 42'-0" long section of existing roof structure over drive thru banking facility including: Temporary bracing of collapsing roof structure per engineering; demolition of roofing, sheathing, 1 ply trusses 24" o.c.; saw cut of existing concrete median; excavation and install. of #5 rebar hoops for two 3'-0" diameter x 3'-0" deep cylindrical footings; installation of two steel bearing plates; installation of two 6" sq. steel columns with beam seat; installation of new 4 ply nailed and bolted, per sealed engineering, wood roof trusses 16" o.c., and plywood roof sheathing. install primer and paint at new steel. drop ceiling tiles.

$35k

Mission, TX

2406 W. Briarwood

Sep 2013

Tear off existing shingles; repair wood deck and install new shingles in a running bond pattern; demo. siding and repair framing and install new siding and 1x wood trim at fireplace chase, apply heavy body stain to match existing; install prefinished aluminum fascia wrap. materials and installation.

$7k

Mission, TX

1904 W. Camellia ave.

Jun 2013

Plans & permit acquisition, demo. existing roof structure; rough framing.

$7k

McAllen, TX