General Contractor - Mill Creek, WA
5.0
DJC General Contractors, Inc. is a greater Seattle area professional construction company. Mission DJC's Mission is to aid in the design of your dream, turn that dream design into a reality, and attain the highest level of customer satisfaction as our customers enjoy living that dream as a reality. Description Multi-capable construction company able to perform various aspects of the construction process. DJC specializes in earthwork, complex remodeling, and outdoor living spaces.
Curt K.
Address
PO Box 14153
Mill Creek, WA 98082
Photo | Project | Date | Description | Cost | Home |
---|---|---|---|---|---|
Everett Bathroom Remodel | Aug 2014 | Complete Master Bathroom Remodel, Including new custom shower, heated floor system, and incorporated bathroom speaker system. | $18k | Everett, WA | |
Redmond Demolition Project | Mar 2014 | Demolished existing Single Family Residence, and cleaned lot for future building site. | $35k | Redmond, WA | |
Deck Transformation | Feb 2014 | Added a custom covering to existing deck. Includes outdoor media for TV and Speakers. | $8k | Woodinville, WA | |
Greenlake Basement Remodel | Feb 2014 | Complete Basement Finishing/Remodel. Project started as an unfinished basement. DJC finished a new full bathroom with custom tile, added windows for natural light, and completely finished entire basement to comfortable living space. | $40k | Mill Creek, WA | |
U-District Demolition | Jan 2014 | Demolished existing Single Family Residence. Cleaned site for future building pad. | $35k | Seattle, WA | |
Magnolia Driveway Replacement | Jan 2014 | Small Driveway replacement. New broom finish driveway. | $4k | Snohomish, WA | |
Burien Screen Room | Aug 2013 | Remodeled existing outdoor structure to have new decking, new walls, and new roof system. New structure is an attached screen room for enjoying the sights, sounds, and smells of the outdoors but still be protected from Western Washington elements. | $35k | Burien, WA | |
North Lake Marina Concrete Slab | Jun 2013 | Forklift Pad replacement. DJC installed a structural reinforcement grid, and poured 325 cubic yards of concrete for a new forklift working pad. | $75k | Seattle, WA | |
Woodinville Rehab | Jan 2014 | Remodeled exterior of house | Woodinville, WA |