Top 10 dock construction services in Port Charlotte, FL
Top questions to ask before hiring a dock building contractor
A professional will assist you with scope and estimates, but having a clear idea of what you want to accomplish will help communication.
Do you want professionals to do everything, or do you have the time and skill to do some of the work?
Many projects such as have a DIY component, such as painting or cleanup.
First and foremost, protect yourself and make sure the contractor and any sub-contractors are licensed, bonded and insured.
Recent reviews for Port Charlotte dock building contractors
Jason is a great local contractor with amazing workmanship!
I needed my seawall reinforced and also wanted to add a boat ramp with a winch system. Jason and crew did a fantastic job and very reasonable in price.
Jason Nix LLC has done multiple projects for me. I can always count on him getting it done and done right.
We have hired Mr. Nix for three separate erosion projects. He has complete each project as per the contract, on time and didn't leave us with a mess. When you hire Jason Nix you can sit back and relax knowing you have hired a contractor who will do grea...
I hired Cape Coral Deck Builders to build a deck and pergola for me in January and I am impressed! These guys built the deck exactly how I wanted it down to every last detail. The lead guy on the job was very professional, he would knock on my door every ...
D Mckenzie not sure if it’s his real name will steal your money, took 1500$ deposit turned phone off never did anything he said. Did not return phone calls or emails. This company is a scam and fraud!!
All dock building contractors in Port Charlotte, FL
Latest projects near Port Charlotte
Within a month
Over 400 sq ft
Permanent
Man-made canal
dock area is 4' or less deep- 57/ long Repair or replace
No
I'm flexible
I'm not sure
Permanent
Man-made canal
Rocky bottom
No
Within a month
Under 100 sq ft
Permanent
Man-made canal
I'm not sure
No
Within a month
I'm not sure
Floating
Man-made canal
Soft or muddy bottom, Water is more than 10 feet deep
No
Within a year
I'm not sure
Permanent
Man-made canal
Soft or muddy bottom
Yes, I have sketches and a basic idea of what I want
I'm flexible
Under 100 sq ft
Permanent
Man-made canal
Strong current, I'm not sure
No
Within 48 hours
I'm not sure
Standing
Man-made canal
brackish water depth pier requirement minimum 5 ft
No
Within a month
100-200 sq ft
Suspended
Man-made canal
Soft or muddy bottom
No
Within a month
200-400 sq ft
Remove existing wood deck and replace with trex or similar material (Wear Deck) 400sq ft
Man-made canal
Not relevant replacing deck only
No