Home

RV pad with curb and stamp border

Dec 2018

Removed mud 3 ft deep in a 30 ft radius to replace it with road base to avoid Concrete from settling and cracking. Formed and poured footing and 12" x 8" curb wall. Poured RV pad with stamp border

$14k