Affordable Plumbing Solutions

Plumber - San Jose, CA

Average rating

info

4.49

4.5

based on 277 online reviews

Average rating

info

4.49

4.5

based on 277 online reviews
based on 277 ratings

Project Gallery

A table showing the projects done by the pro

Photo

Project

Date

Description

Cost

Home

Shower valve retrofit kit in marble

Mar 2014

Shower valve retrofit kit in marble

$850

San Jose, CA

Toto toilet installed

Mar 2014

Toto toilet installed

$575

San Jose, CA

50 gallon water heater

Jan 2014

50 gallon water heater

$1k

San Jose, CA

San Jose 2013

Jan 2013

Permit Number: 2013-002593-000-00-MF Permit Type: Permit Description: Multiple Attached Dwellings Apartment Additions/Alterations Bath Tub Replacement Apartment

San Jose, CA

San Jose 2013

Jan 2013

Permit Number: 2013-001854-000-00-RS Permit Type: Permit Description: 1 & 2 Family Detached Dwellings Single Family Sub-Trades Only REROUTE MAIN GAS LNE TO RELOCATE GAS METER Single Family

San Jose, CA

Milpitas 2008

Feb 2008

Permit Number: E-EN08-0023 Permit Type: ENCROACHMENT Permit Description: 2/14/2008 2/14/2008 Build service riser on pole & pull U.G. cable to new AT&T PG&E to build 1-2' service riser on pole & pull new underground cable to new AT&T meter pedestal. This work must be completed before the last week of April 2008, because of street resurfacing activity at this location starting in the First week of May 2/21/2008 2/22/2008 PG&E to pull cable thru AT&T installed conduit & make conne 2/25/2008 2/25/2008 Directional boring to insatall conduit across Alder Drive Directional boring to insatall conduit across Alder Drive. The fiber optic line will be pulled after the Council approval of the agreement. 3/3/2008 3/3/2008 Centria ATT conduits installation S. Abel St./Capitol Ave. 3/7/2008 3/7/2008 PG&E to pull wire in AT&T's conduit & install CL4 joint pol PG&E to pull 1/0A Triplex in customer's 1-3' conduit. Install 1-15 KVA PB TX; install 1-2' Riser; install 1-50' CL4 Joint Pole & install 1-100 AMP meter 3/11/2008 3/11/2008 PG& E to pull conductor thru 231' of AT&T conduit & Install 3/11/2008 3/14/2008 PG&E to pull conductor thru AT& T conduit & Install Transfo 3/14/2008 3/17/2008 2' boring to 100 ft logs with truck mounted rig 2 - inch boring to 100 ft logs with truck mounted rig, and with 3 four inch pilot holes to 5 ft. logs 3/14/2008 3/17/2008 2' sub-surface boring to 100 ft. with truck mounted rig 2-inch sub-surface boring to 100 ft. with truck mounted rig, and with 3- four-inch pilot holes to 5 feet logs 3/14/2008 3/24/2008 2' sub surface boring to 100 ft. logs w/ truck mounted rig 2' sub-surface boring to 100 ft. logs with truck mounted rig and with 3 - 4' pilot holes to 5' logs 3/7/2008 3/18/2008 Bore & Place 2-2' Conduit 2/14/2008

Milpitas, CA