TKO Roofing

Roofer - Spring Hill, TN

Average rating

info

5.00

5.0

based on 15 online reviews

Average rating

info

5.00

5.0

based on 15 online reviews
based on 15 ratings

Project Gallery

A table showing the projects done by the pro

Photo

Project

Date

Description

Cost

Home

Handyman Services

Nov 2015

Installed two white closet shelves. Put together two big wood storage cabinets. We also put together a 6 teir grauge storage shelving unit.

$250

Billings, MT

Twilight Dr Deck Job

Sep 2015

Built a 8x20 foot deck and installed lattice around the bottom. Costumer did request that we leave the post long, due to them wanting to install a roof over the deck themselves.

$4k

Billings, MT

Ave B Installation of Fascia and Soffit

Aug 2015

Installed aluminum soffit and fascia on apartment complex carport.

$815

Billings, MT

Terry Ave Metal Siding Install

Aug 2015

Installed metal siding on home. Customer did want labor only as we agreed that was fine.

$2k

Billings, MT

Commercial Painting Big R Downtown Billings

Aug 2015

Pressure washed entire building. Scraped and applied peel bonding primer in preparation for painting. The peel bonding primer that we use is a glue like substance that prevents future peeling. Sprayed the entire building with super paint. We purchase our paint at Sherwin Williams and its called super paint, it has a 25 year warranty and is a primer and paint in one.

$10k

Billings, MT

Residential Tear off and Re-Roof 2nd Street

Jul 2015

Tore off 2 layers of shingles. Re-decked entire roof and re-roofed in Malarkey shingles.

$7k

Billings, MT

LFS Properties Residential Dutch Door installation

Apr 2015

Took out previous sliding door and installed dutch doors in it's place. This project did involve re-framing work.

$350

Billings, MT

LFS Properties Residential Interior Painting & Door Installation

Apr 2015

Installed font door on home and painted entire downstairs of home and partial upstairs.

$1k

Billings, MT

Concrete Tear Out & Pour John DR.

Apr 2015

Tore out existing concrete and disposed of concrete. Hauled in rock and leveled out the ground for preparation of concrete. Poured roughly 12 yards of concrete with a brush finish.

$5k

Billings, MT