Project Gallery

A table showing the projects done by the pro

Photo

Project

Date

Description

Cost

Home

Re-Roof

Feb 2015

-Complete tear-off and removal of 3 layers of shingles on all sides of the roof -Re-deck 100% of the roof with 7/16 OSB wafer board plywood -Install new ice and water at eaves -Install new synthetic felt as underlayment material -Install new drip metal on all sides of perimeter -Install new flashing's at rakes fireplace -Install new pipe flashings -Install new air vent to meet ventilation codes -Install new 30 year architectural shingles as roofing material -Complete clean up of debris upon completion -Proximity dimensions of the roof are 1,800 sq ft including hip and ridge

$8k

Salt Lake City, UT

Leak Repair

Feb 2015

Fixed leak on unit 2 located by the north east of the roof over by the window -Searched area of 15 feet by 15 feet -Remove and clean gravel material on area off 225 sq ft to repair the leak -Clean well surface to apply Rubber wet patch roof cement -Proximity dimensions of the work are 1 leak

$350

Bountiful, UT

Tear off & Removal

Feb 2015

Complete tear-off and removal of 2 layers of shingles on west east and north side of the house only -Re-deck 100% of the roof with 7/16 OSB wafer board plywood -Install new ice and water shied at eaves -Install new synthetic felt as underlayment material -Install new drip metal on all sides of perimeter -Install new pipe flashing's -Install new ridge vent to meet ventilation codes -Install new 30 year architectural shingles as roofing material -Install 6 nails per shingles -Complete clean up of debris upon completion -Proximity dimensions of the roof are 1,100 sq ft including hip and ridge

$4k

Salt Lake City, UT

Re-Roof Lower Deck

Feb 2015

Install new 1/4 inch to 7" Taper system foam to drain water properly -Install new 1/2 inch energy start insulation on top of taper material -Install new 60ml white TPO membrane as roofing material -Install new pipe flashings -Install new flashings at walls -Install new termination bar on wall flashings and west side of the roof -Complete clean up of debris upon completion -Proximity dimensions of the roof are 800 sq ft

$4k

Salt Lake City, UT

Roof Repair

Feb 2015

Fix 2 leaks by the main entrance -Complete removal of titles on north side of the valley located by the main entrance of the house -Install new ice and water shield on the valley area -Install new valley metal -Install new 1x2 wood boards -Re-install titles -Remove and replace 3 broke titles on the south side of the valley located by the main entrance -Complete clean up of debris upon completion

$2k

Alpine, UT

Re-Cover

Feb 2015

-Install new drip metal on all sides of perimeter -Install new pipe flashing's -Install new air vents to meet ventilation codes -Install 30 year architectural shingles as roofing material -Install 6 nails per shingles -Complete clean up of debris upon completion

$4k

Tooele, UT

Tear-off & Removal

Feb 2015

Complete tear-off and removal of 3 layers of shingles on all sides of the roof -Build Cricket behind chimney to drain water properly -Remove and replace deteriorated wood decking at an additional cost of $1.50 per sq. ft -Install new ice and water shied at eaves -Install new synthetic felt as underlayment material -Install new drip metal on all sides of perimeter -Install new flashing's at rakes fireplace and skylights -Install new pipe flashing's -Install new ridge vent to meet ventilation codes -Install new 30 year architectural shingles as roofing material -Install 6 nails per shingles -Complete clean up of debris upon completion -Proximity dimensions of the roof are 1,500 sq ft including hip and ridge

$5k

Murray, UT

Re-Cover

Feb 2015

nstall new drip metal on all sides of perimeter -Install new pipe flashing's -Install new air vents to meet ventilation codes -Install 30 year architectural shingles as roofing material -Install 6 nails per shingles -Complete clean up of debris upon completion

$4k

West Valley, UT

Re-Roof

Jan 2015

Fully adhered TPO membrane -Install new 60ml white TPO membrane as roofing material -Install new drip metal on all sides of perimeter -Install new cover tape on all sides of perimeter -Complete clean up of debris upon completion -Proximity dimensions of the roof are Sq Ft including slope and flat roof

$3k

Lehi, UT