Patricia S.
I signed a contract in November, 2018 that stated in writing that my bathroom and laundry area would be completed by December 20, 2018. As of today, March 31, 2019 it is not done. The shower is not tiled, the shower door is not installed, the toilet is not installed, the floor is not tiled, the vanity and shelves are not installed, the plumbing fixtures and light fixtures are not installed. There were no unexpected issues with the structure or materials that should have caused delays. Unfortunately, I gave Curt Cameron about 80% of the total project costs in early December based on his promises to finish the job by December 20.
Address
1522 Huntington Rd
Waterloo, IA 50701