Cost

Home

Bridge

Apr 2022

Top cap replacement

$1k

West Linn, OR

Lincoln Heights HOA

Mar 2016

Gerard Brooks construction supplied labor,material and equipment to remove 20 ft of damaged top rail, removed 15 ft of 6' fencing,straightened 1 post and reset one post cap ,hand excavated dirt along repaired section of fence . We also removed and reset a 2x8 pressure treated board that was holding dirt into the yard.

$2k

Portland, OR

Millridge HOA

Feb 2016

Gerard Brooks Construction to supply labor and material and equipment to do the following work...........Unit 1682 All work to be done on front side walk leading up to front door. We will remove and replace 15ft of side walk, the new side walk will be slightly higher than the original as requested by the board. New sidewalk will tie into main side walk as to insure a smooth transitions.(PLEASE NOTE NEW SIDEWALK WILL HAVE A SLIGHT ELEVATIONS CHANGE TOWARDS THE MIDDLE TO ENSURE WATER DOES NOT ACCUMULATE)........Club House side walk.... Gerard Brooks Construction to remove and dispose of any construction related debris, any other work needed to complete this repair other than what is stated above will be an additional charge. Additional charges will first be approved by owners and or home owners representative before work can commence. Gerard Brooks Construction will require 50% due on prior to start of project and 50% due after completion.

$2k

Portland, OR

Greystone at Altamont

Jan 2016

Gerard Brooks Construction to supply labor material and equipment to remove and replace trims at windows on north side lower window. we will replace lower trim and left side trim.....On west side lower window we will replace bottom trim left trim and right trim total of 5 pc. Gerard Brooks Construction to also paint all new material installed.Any other work needed to complete these repairs will be an additional charge. Any additional charges will first be approved by management (CMI) before moving forward...Gerard Brooks Construction expects this repair to take approximately 2 days to complete from start to finish.

$2k

Portland, OR

Oak Park HOA

Dec 2015

Gerard Brooks Construction will remove and replace caulking at right hand side of upper window......We did observe that someone has attempted to repair this leak. I think that if when we are completed and does not resolve the issue then a roofer should be dispatched to avoid further damage to the property.

$315

Camas, WA

Hall Place

Aug 2014

Gerard Brooks Construction supplied Labor to install framing and Timbertech decking.Labor and material(Stringers only) for stairs build to hot tub.Labor and material for fencing.Labor and material (trim ,flashing ,caulking, lattus) for completing the siding and trim, thresh hold at deck entry door and paint.Gerard brooks Construction to clean up and haul away all construction related debris.

$21k

Portland, OR

Irving Street Towers

Jan 2016

Gerard Brooks Construction will repair sheet-rock in bathroom. We will paint repair to match existing.....(There may be slight variances in the color of the paint) we will paint location of repair only above tub.

$700

Portland, OR

CMI Essensa Property

Jan 2016

Gerard Brooks Construction Removed and replaced garage door trims that included: removing 2 damaged layers of sheeting at right side of garage and replacing them with pressure treated material, We replaced the damaged trim with 2x8 trim anchoring all to concrete walls and on that same side we replaced the 1x3 trim.........TOP TRIM OF GARAGE we removed and replaced the 1x8 trim replacing with 2x8 trim and anchoring to concrete, we also removed and replaced the 1x3 top trim . Gerard Brooks Construction also removed and reset the garage door weather striping and removed and replace 2ft of damaged weather striping. All materials installed were caulked and painted................PLEASE NOTE there appears to be water coming through the concrete wall at right side of garage I highly do suggest a water intrusion specialist to advise on this and supply specs to repair.

$1k

Portland, OR

Lincoln Heights HOA

Jan 2016

Gerard Brooks Construction will provide fencing services as follows...Lot 66..... Remove and replace 12ft of top rail, reset 2 field post, reset 10ft of fencing Lot 88.....reset post cap, reset top rail

$350

Portland, OR