Top 10 Concrete Contractors in Champlin, MN
Top questions to ask before hiring a concrete contractor
A professional will assist you with scope and estimates, but having a clear idea of what you want to accomplish will help communication.
Do you want professionals to do everything, or do you have the time and skill to do some of the work?
Many projects such as have a DIY component, such as painting or cleanup.
First and foremost, protect yourself and make sure the contractor and any sub-contractors are licensed, bonded and insured.
All Concrete Contractors in Champlin, MN
Latest projects near Champlin
Recent projects booked on Porch
Maple Grove 55369
Grading
Start Date
Within 48 hours
Within 48 hours
Landscaping service needed
LEVEL GROWN
LEVEL GROWN
Other landscaping service needed
Land grading and leveling
Land grading and leveling
Grading project purpose
Preparation for landscaping
Preparation for landscaping
Size of grading area
Under 5,000 sq ft
Under 5,000 sq ft
Items needing to be removed first
No
No
Underground utility survey already condcuted
No
No
Grading area topography
Slight slope
Slight slope
Soil needing to be hauled to or away from site
Yes, soil will be hauled to the property
Yes, soil will be hauled to the property
Champlin 55316
Concrete
Start Date
Within 48 hours
Within 48 hours
Type of work
Major concrete
Major concrete
Kind of concrete work
Delivery
Delivery
Reason
Exterior patio or walkway
Exterior patio or walkway
Square footage
100 - 500 sq ft
100 - 500 sq ft
Need pump truck
No
No
Project status
Ready to hire
Ready to hire
Kind of location
Home/residence
Home/residence
Authorization to make changes
Yes
Yes
Dayton 55327
Grading
Start Date
Within 48 hours
Within 48 hours
Landscaping service needed
Flatten a horse paddock area
Flatten a horse paddock area
Other landscaping service needed
Land grading and leveling
Land grading and leveling
Grading project purpose
I tried to level an manipulate weeds and manure and had wrong equipment and got bobcat repeatedly stuck. It's a simple job, but need a skidsteer with tracks.
I tried to level an manipulate weeds and manure and had wrong equipment and got bobcat repeatedly stuck. It's a simple job, but need a skidsteer with tracks.
Size of grading area
1/2-1 acre
1/2-1 acre
Items needing to be removed first
No
No
Underground utility survey already condcuted
Yes
Yes
Grading area topography
Flat
Flat
Soil needing to be hauled to or away from site
No
No