Top 10 epoxy flooring coating services in Grafton, WI
Costs to Epoxy Coat Garage Floor
Top questions to ask before hiring an epoxy floor coating specialist
A professional will assist you with scope and estimates, but having a clear idea of what you want to accomplish will help communication.
Do you want professionals to do everything, or do you have the time and skill to do some of the work?
Many projects such as have a DIY component, such as painting or cleanup.
First and foremost, protect yourself and make sure the contractor and any sub-contractors are licensed, bonded and insured.
Recent reviews for Grafton epoxy floor coating services
Very affordable, but I guess you get what you pay for. Jason often never showed up when he said he would, and it was like pulling teeth getting him to finish our project. He is a super nice guy, but a year after installing and grouting our bathroom tile i...
Terrible job. We spent over $15,000 on a job that needed new siding, new windows and a sliding door. They put the sliding door on wrong, put the screen door upside down and drilled new holes in the door, even tho their were different ones already predrill...
John is great to work with. He and his team delivered perfectly on our project. One thing that I really like about working with John, he sees the big picture. If he sees something that needs to be addressed, he gives a full reasoning of why and how it ...
We had a terrible experience with Brian. Several significant mistakes were made on my addition/remodel project. His work quality is poor. We had to fire Brian. After the fact, his own contractors shared other nightmare jobs that Brian did. Learn from ...
I hired Brian per good reviews online but....as far as I am concerned I would never hire him again. He rushed a job he said he would get done but something always came up then he said they would be ready and he worked on them the day he delivered. I got t...
We contracted with NuStone in March 2017 to provide a new counter top and back splash for our kitchen. We also contracted for a new electrical outlet as well as some dry wall/plaster repair. The job was to have been completed late April/early May. Th...