KZ Construction

Remodeling Contractor - Mason City, IA

Project Gallery

A table showing the projects done by the pro

Photo

Project

Date

Description

Cost

Home

second story remodel

Aug 2018

completely gutted second story took out all interior walls and made it one complete master bedroom with full bathroom with shower. Installed bathroom walls made of 3 inch glass block. Poured shower pan 9ft x 5ft. Tiled shower walls and bathroom floor. Framed in closets and elevator which replaced the staircase. Drywalled entire master bedroom finished and texted ceilings and walls.

Floyd, IA

Full Roof build

Nov 2014

Full roof new build

Mason City, IA

Dig hole

Nov 2014

Dig the hole in the basement to create a sub - pump

Mason City, IA

Winter Prep

Nov 2014

Insulation, heating work, water system

Charles City, IA

Deck with pergola roof

Aug 2014

New deck build with pergola roof

Mason City, IA