Rutledge Maul Architects

Architect - Shoreline, WA

Average rating

info

5.00

5.0

based on 2 online reviews

Average rating

info

5.00

5.0

based on 2 online reviews
based on 2 ratings

Project Gallery

A table showing the projects done by the pro

Photo

Project

Date

Description

Cost

Home

Avalon Alderwood

Jun 2014

This 491 unit apartment complex is conveniently located adjacent to a scenic wooded wetland area on site, and a large commercial center across the street. A planned network of pedestrian pathways link the 10 residential buildings to the wetlands and the on site amenities including a clubhouse, energy star appliances, a two story state-of-the-art fitness center over looking the pool, and a large outdoor grilling area. The project is planned to be built in two phases. Phase I is on a 13.75 acre plot and includes buildings one through six (367 units). Phase I has two large podium buildings, with underground parking and 5 stories of apartments above, facing the commercial complex across the street at Alderwood Mall Pkwy. The remainder of the buildings are a mix of walk-up apartments and town home style apartments with attached garages. Phase I began construction in late 2012 and planned completion for fall of 2014. Phase II will begin construction in January of 2015. Phase II is comprised of buildings seven through ten and has 124 units. Phase II is on a smaller 4.96 acre plot adjacent to Phase I off of Alderwood Mall Parkway.

Lynnwood, WA

The Reserve

Apr 2014

Planning for this project began in September of 2011 and ground breaking at the site started in April of 2013. The project objective was to create an upscale living environment that incorporates the architecture and culture of the adjacent Town Center into the community. This Multifamily project has 95 units in five 3 story buildings. The units surround a spacious courtyard including a pool, fireplace gazebo and open lawn areas.

Mill Creek, WA

Veloce

Sep 2011

Redmond TOD is a 322 unit multi-family mixed use project in downtown Redmond that is to be the focal point of the transit oriented development for the city. The podium style building has street level retail and 2 levels of parking below 3 - 5 story of apartment buildings. The project caters to young professionals who desire an urban living setting as well as commuters, as a Metro KC park & ride garage is currently under design adjacent to the site. Light rail will eventually run next to the building, making it the hub of downtown Redmond. Construction started in September, 2007 and was completed in 2011. This project won the City of Redmond's Outstanding Design Award

Redmond, WA

Remodeling Redmond 2000

Jun 2000

Permit Number: B00M0591 Permit Type: Residential Building - Addition-Improvement, Building/Residential Building/Addition-Improvement/NA Permit Description: Building/Residential Building/Addition-Improvement 2-STORY ADDITION AND REMODEL TO EXISTING RESIDENCE (INCL OUTDOOR FIREPLACE/BBQ)

$130k

Redmond, WA

Village Center

Aug 2003

Village Center is a mixed-use residential and commercial project located in Mukilteo, Washington. The project contains 235 residential units and approximately 4,000 s.f. of commercial space and 10,000 s.f. of hybrid live/work space. In addition to the residential development designed by RMA an additional mixed-use building will be erected within the project boundary. A second phase on the adjacent parcel is under construction and will add 103 town homes to the site.

Mukilteo, WA

Issaquah 2000

Feb 2003

Permit Number: B02M2290 Permit Type: Addition-Improvement - MF-Commercial, Building/Addition-Improvement/MF-Commercial/NA Permit Description: Building/Addition-Improvement/MF-Commercial ADDING MAINTENANCE ROOM TO B99L3010 -- THE TIIMBERS II

Issaquah, WA