Top 3 Dock Building & Repair Contractors in Mineral, VA
Top questions to ask before hiring a dock building & repair contractor
A professional will assist you with scope and estimates, but having a clear idea of what you want to accomplish will help communication.
Do you want professionals to do everything, or do you have the time and skill to do some of the work?
Many projects such as have a DIY component, such as painting or cleanup.
First and foremost, protect yourself and make sure the contractor and any sub-contractors are licensed, bonded and insured.
Recent reviews for Mineral Dock Building & Repair Contractors
Latest projects near Mineral
Recent projects booked on Porch
Mineral 23117
Deck Construction
Start Date
Within a month
Within a month
Existing deck
Yes
Yes
Approximate size of deck to build
250-500 sq ft
250-500 sq ft
Decking and railing materials
Synthetic or composite
Synthetic or composite
Deck features
Stairs, Nothing extra, just the deck
Stairs, Nothing extra, just the deck
Other deck features
No, thanks, just the deck
No, thanks, just the deck
Extent of design or prep work
No
No
Mineral 23117
Dock Construction
Start Date
Within a month
Within a month
Preferred size of dock
200-400 sq ft
200-400 sq ft
Kind of dock
Permanent
Permanent
Location of dock
Lake or pond
Lake or pond
Location characteristics
I'm not sure
I'm not sure
Extent of design prep
No
No
Mineral 23117
Dock Construction
Start Date
Within a year
Within a year
Preferred size of dock
Over 400 sq ft
Over 400 sq ft
Kind of dock
Permanent
Permanent
Location of dock
Lake or pond
Lake or pond
Location characteristics
I'm not sure
I'm not sure
Extent of design prep
Yes, I have sketches and a basic idea of what I want
Yes, I have sketches and a basic idea of what I want
Mineral 23117
Deck Construction
Start Date
Within a month
Within a month
Existing deck
No
No
Approximate size of deck to build
100-250 sq ft
100-250 sq ft
Decking and railing materials
Pressure-treated pine
Pressure-treated pine
Deck features
Stairs
Stairs
Other deck features
No, thanks, just the deck
No, thanks, just the deck
Extent of design or prep work
Yes, I have sketches and a basic idea of what I want
Yes, I have sketches and a basic idea of what I want
Mineral 23117
Dock Construction
Start Date
Within a year
Within a year
Preferred size of dock
Over 400 sq ft
Over 400 sq ft
Kind of dock
Permanent
Permanent
Location of dock
Lake or pond
Lake or pond
Location characteristics
Soft or muddy bottom
Soft or muddy bottom
Extent of design prep
Yes, I have sketches and a basic idea of what I want
Yes, I have sketches and a basic idea of what I want
Mineral 23117
Dock Construction
Start Date
Within 48 hours
Within 48 hours
Preferred size of dock
I'm not sure
I'm not sure
Kind of dock
Permanent
Permanent
Location of dock
Lake or pond
Lake or pond
Location characteristics
I'm not sure
I'm not sure
Extent of design prep
No
No
Mineral 23117
Dock Construction
Start Date
Within a month
Within a month
Preferred size of dock
200-400 sq ft
200-400 sq ft
Kind of dock
Floating
Floating
Location of dock
Lake or pond
Lake or pond
Location characteristics
Sandy bottom, Rocky bottom, I'm not sure
Sandy bottom, Rocky bottom, I'm not sure
Extent of design prep
Yes, I have plans and all required permits
Yes, I have plans and all required permits
Mineral 23117
Dock Construction
Start Date
Within a year
Within a year
Preferred size of dock
Over 400 sq ft
Over 400 sq ft
Kind of dock
Permanent
Permanent
Location of dock
Lake or pond
Lake or pond
Location characteristics
Soft or muddy bottom
Soft or muddy bottom
Extent of design prep
Yes, I have sketches and a basic idea of what I want
Yes, I have sketches and a basic idea of what I want
Mineral 23117
Dock Construction
Start Date
Within a month
Within a month
Preferred size of dock
I'm not sure
I'm not sure
Kind of dock
Permanent
Permanent
Location of dock
Lake or pond
Lake or pond
Location characteristics
Soft or muddy bottom
Soft or muddy bottom
Extent of design prep
No
No