Top 10 dock construction services in Tellico Village, TN
Top questions to ask before hiring a dock building contractor
A professional will assist you with scope and estimates, but having a clear idea of what you want to accomplish will help communication.
Do you want professionals to do everything, or do you have the time and skill to do some of the work?
Many projects such as have a DIY component, such as painting or cleanup.
First and foremost, protect yourself and make sure the contractor and any sub-contractors are licensed, bonded and insured.
Recent reviews for Tellico Village dock building contractors
I am truly impressed with the quality of service I received when having CrawlJacks & Encapsulation installed in my home by EvrDry. I had several broken floor joists in my home that made my floors so slanted that I had to shim up one side of my bed frame l...
Mr. Mayse was polite and professional, knowledgeable and prompt. He gave a reasonable estimate and came out the next day after we signed the contract tomstart work. The original steps were weak and of varying heights making it hard for me as I'm disable...
All dock building contractors in Tellico Village, TN
Latest projects near Tellico Village
Within a year
I'm not sure
Permanent
Lake or pond
Dock already in place on lake Tellico Corntassele branch. Needs second floor remodel
Yes, I have plans and all required permits
I'm flexible
Over 400 sq ft
Permanent
Bay or sound
Sandy bottom
No
Within 48 hours
Over 400 sq ft
Permanent
Lake or pond
Soft or muddy bottom
Yes, I have sketches and a basic idea of what I want
Within a year
Over 400 sq ft
Permanent
Lake or pond
Strong current, Water is more than 10 feet deep, Soft or muddy bottom, Rocky bottom, Waves or swells over 2 feet high
No
Within a year
I'm not sure
Permanent
Lake or pond
I'm not sure
No
Within a month
Over 400 sq ft
Permanent
Lake or pond
I'm not sure
No
I'm flexible
I'm not sure
Permanent
Lake or pond
I'm not sure
No
I'm flexible
Over 400 sq ft
Permanent
Bay or sound
Water is more than 10 feet deep, Sandy bottom
Yes, I have sketches and a basic idea of what I want
Within a month
I'm not sure
I'm not sure
Bay or sound
Water is more than 10 feet deep, Soft or muddy bottom
No