Complete Construction

General Contractor - Palmyra, TN

Average rating

info

5.00

5.0

based on 2 online reviews

Average rating

info

5.00

5.0

based on 2 online reviews
based on 2 ratings

Project Gallery

A table showing the projects done by the pro

Photo

Project

Date

Description

Cost

Home

Borchick Veterans Affairs Handicap Ramp

Mar 2014

Complete Construction built a handicap ramp approximately 10 feet off the steps to a 25 square foot landing and approximately 14 feet to the driveway.

$6k

Clarksville, TN

Golson Poolside Deck Remodel

Jan 2013

Complete Construction stripped the existing deck of handrails and decking boards replacing with new decking boards and a custom built handrail. Complete Construction replaced the existing support posts with 6x6 posts set in 8 inches of concrete and set on 12 inch thick concrete footers. Complete Construction built a new gable roof on top of the existing deck. Complete Construction built a new deck approximately 200 sq ft around the pool.

$17k

Clarksville, TN