T&R dirt works

Excavation Contractor - Rochester, WA

Project Gallery

A table showing the projects done by the pro

Photo

Project

Date

Description

Cost

Home

logging road install

Jul 2014

this is a mile long road. half had gravel currently on it and needed re-graded. the second half had a washed out culvert that we built up and added gravel and the rest was graded in with no gravel.

$2k

Winlock, WA

driveway install

Jun 2014

this is a 500ft road installed thru a bare piece of property with a large pad at the end for a family to get to the middle of the property where they are planning and building their new home

$1k

Winlock, WA

brush burning

May 2014

this job had 12 large brush piles that we piled up and burned.

$2k

Olympia, WA

equipment hauling

Feb 2015

hauled a d4 dozer from castle rock to maytown

$300

Tumwater, WA

garden tilling

Sep 2014

garden tilling

$150

Olympia, WA

main road driveway

Aug 2014

This is a road installed off a main road that needed a culvert installed to cross the ditch. the road is 450 ft long. layed with 1 1/4 minus gravel

$2k

Winlock, WA