CFM Electrical Services

Electrician - Acworth, GA

Project Gallery

A table showing the projects done by the pro

Photo

Project

Date

Description

Cost

Home

Basement Renovation

Jan 2013

Created this living space in an unfinished basement. Worked with contractor, Hvac, Plumber and carpenter. We were able to use the Customer existing panel to complete the project. List of materials 800 ft. of 12/2 wire (10) switches (6)20 amp breakers (15) 20 amp outlets Lighting 20 cans 2 ceiling fans (4) three way switches 6 single pole switches w dimmers 6 circuits two dedicated for refrigerator and electric fire place/heater.

$3k

Kennesaw, GA

Install new commercial Water Jet Metal Cutting

Jan 2014

Install new commercial Water Jet Metal Cutting System Provide Electrical Power to Pumps Provide Electrical Power to control system Installed circuit breakers and disconnect Installed 2 1/2 in conduit to industrial standards Installed 3/4 in conduit to industrial standards Pulled appropriate wire for Water Jet Metal Cutting System Pulled appropriate wire for Control system Terminated all connections Rewired motors and transformers for appropriate Preformed all system tests necessary

$5k

Alpharetta, GA

Garage Construction

Oct 2013

1) Install one new 200 A Single Phase Service in Bldg. 2) Install new 110 v 20A Duplex outlets (30 locations) 3) Install new 220v 20A outlets (25 locations) 4) Provide 11 new 110v 20 A circuits for outlets listed in item 2 (?) 5) Provide 7 new 220v 20 A circuits for outlets listed in item 3 (?) 6) Provide 1 new 220v 20 A circuit in slab 7) Provide wiring for 2 new exhaust fans 8) Provide wiring for one new Mitsubishi Wall Mounted Heating/Air. 9) Provide wiring for one new elect water heater 10) Provide wire and install 23 new 2 x 4 fluorescent light for use in auto shop (9 lights in work shop) (6 lights in storage / paint finishing) (2 lights in bathroom) 11) Provide wiring & install 5 vapor proof 1 x 4 fluorescent lights for exterior walkway 12) Provide wiring & install 4 new 150 w wall pack lights for exterior bldg lighting 13) Provide 3 110v 20 a circuits at garage door locations for future elect openers 14) Provide one 220v 20A circuit for auto lift 15) Provide wiring for one new propane gas furnace

$12k

Cartersville, GA

Added an appartment in the basement of a house

Jan 2013

Customer had an apartment built in there basement to be able to rent. One bedroom, Bathroom, Living Room, Full kitchen. Had to install a sub panel to the main electrical panel. materials listed for the project below: #12 Wire 1325' #10 Wire #6 Wire UT Box 1 Gang Box 2 Gang Box Round Box Sub Panel Can Lights Trims for Can Lights (3) Dimmers (1) Three Way Dimmer 60 Amp Breaker 30 Amp Breaker 20 Amp Breakers 230 V 30 Amp Outlet GFI Outlets 18 Outlet Three Way Switch Four Way switch Switch Bath Fan Switch Plates 2 Gang Switch Plate Outlet Plate Ut Cover Plate Connectors Crimps Wire Nuts Staples Drill Bit 2 Cases of Bulbs Nail Gaurds

$4k

Marietta, GA

Lighting added to a home for resale

Jan 2013

9 New Construction Cans 72.00 Kitchen 4.00 30.00 120.00 3 Remodel Cans 42.00 Great Room 8.00 30.00 240.00 11 Black Trims for Cans 110.00 Master Bedroom 4.00 30.00 120.00 2 Gang Cutin Box Kitchen 2.30 Install Foyer Medallion 3.00 30.00 90.00 2 Gang Cutin Box Great Room 2.30 Install Great RM Medallion 3.00 30.00 90.00 1 Switch 1.00 Install Dining RM Medallion 1.00 30.00 30.00 3 Dimmers 39.00 30.00 0.00 1 Stacked Switch 9.00 30.00 0.00 1 Combo Plate 1.40 30.00 0.00 (2) @ Gang Switch Plates 2.80 30.00 0.00 Wire 300 Feet 103.00 30.00 0.00 Staples 4.50 30.00 0.00 Connectors 3.00 30.00 0.00 Bulbs 40.00 30.00 0.00 Misc 20.00 30.00 0.00 30.00 0.00 Subtotal Materials 452.30 Total Labor Cost 23.00 690.00 Tax 27.14 Total Materials 479.44 Total Labor Cost 690.00 Total Estimate 1,169.44

$1k

Marietta, GA