Hunt Construction

Concrete Contractor - Alburnett, IA

Average rating

info

4.83

4.8

based on 33 online reviews

Average rating

info

4.83

4.8

based on 33 online reviews
based on 33 ratings

Project Gallery

A table showing the projects done by the pro

Photo

Project

Date

Description

Cost

Home

Retaining wall repair

Jul 2014

The old retaining wall was falling over, because the posts were not in the ground far enough. We tore out the old wall and dug the posts an additional two feet and concreted around them, and anchored the timbers to the new posts with 8 inch wood lags.

$3k

Marion, IA

Back yard patio

Jun 2014

Customer removed his old wood deck and we poured a new concrete patio, with a set of steps. We colored the concrete to give it a little different look, and added a brick border.

$6k

Marion, IA

Concrete Porch Steps

May 2014

Tore out old prefabbed concrete steps, and dug frost footings, and poured new concrete steps in place. This job went smoothly, with the exception of the concrete company delivering concrete on time. Finally went with a different concrete company. This job a day.

$1k

Cedar Rapids, IA

Back yard patio

May 2014

Poured a colored stamped patio with a built in fire pit. It was a cobblestone style stamp with a seamless border.

$4k

Earlville, IA

Driveway Reconstruction

May 2014

Poured new concrete over top of an existing gravel driveway. Homeowner wanted a concrete driveway, to get away from having a plain old gravel driveway. It took about three days to complete.

$6k

Earlville, IA

Parking area addition

May 2014

Homeowner wanted a small 8' by 13' parking spot added on in his driveway. This was half a day job. Everything went smoothly.

$468

Cedar Rapids, IA

Concrete Porch Steps

May 2014

Tore out the old existing cinder block steps, and replaced them with new concrete poured in place steps.

$850

Marion, IA

Driveway Reconstruction

Jan 2014

Tore out an existing driveway, that was cracked and pealing up. Replaced with brand new concrete, with rock underneath, and put in reinforcing rod. When tearing out the old driveway we went to far into the street, and put in six inches of asphalt at the end of the driveway. The old concrete was so crumbly it was falling apart at the street.

$3k

Marion, IA

Driveway Reconstruction

Jan 2014

tore out existing driveway, and added an additional ten feet to the south of driveway, for a parking spot. One problem encountered was the driveway was completely flat from the garage to the street, so we suggested putting a drain with a grate over top of it right in front of the garage, to keep water from running into the garage. The homeowner thought this was a good idea, and the problem was solved. One night it rained, so the next morning there was mud in the pour, but we dug it out, and rocked the pour area, and poured over a dry base. This job took about 5 days.

$7k

Marion, IA