Home

upgrade electrical panel

Dec 2015

This panel was located in a bathroom which is not code. The panel was replaced with an updated one and the wall had to be reframed to locate the panel outside of the bathroom.

$2k

Auburn, WA

upgrade to full bath

Dec 2015

this bathroom started as a 1/2 bath and client wanted to upgrade to a full bath. We relocated the toilet and added in a shower stall.

$10k

Shoreline, WA

front door

Oct 2015

removed one window, reframed for a 4ft x 6'8 door.

$3k

Algona, WA

vg fir ceiling

Aug 2015

The old ceiling was tongue and groove stained fir. The client wanted a ceiling with no knots. The ceiling was done with T&G vertical grain fir. The beams were wrapped with laminated vertical grain fir plywood.

$70k

Maple Valley, WA

finish kitchen

Jul 2015

ceiling was reframed lower to cover exposed wiring, cabinets were cleaned and repainted, there was some electrical work to be done for the lighting, the room was textured and then painted

$8k

Auburn, WA

Bathroom & Kitchen Remodel, Shorline

Dec 2015

Transforming a half bath into a full bath. Relocated the toilet. Put in new sink and vanity. We're using some really handsome Italian Tile.

Shoreline, WA