qac construction

Remodeling Contractor - Bloomington, IL

Average rating

info

5.00

5.0

based on 4 online reviews

Average rating

info

5.00

5.0

based on 4 online reviews
based on 4 ratings

Project Gallery

A table showing the projects done by the pro

Photo

Project

Date

Description

Cost

Home

rental property

Sep 2015

Basement:frame out basement after altering floor plan, drywall,insulate,prime&paint,trim out,install egress window,install weinscott & ledge around outer wall,vinyl flooring,ceramic bath floor,tiled shower walls&ceiling,vanity,sink,faucet,mirror&lighting. 1st floor:vinyl flooring in kitchen,dining room,and living room,paint walls&trim&doors,install kitchen backsplash,base trim,and casing trim. 2nd floor:paint walls&trim&doors,change all knobs& hinges,ceramic tile bath floor &tub/shower walls,paint vanity,install new counter,sink,faucet,reframe old mirror&paint frame,and install light fixture

$25k

Normal, IL

painting/flooring renovation

Mar 2015

Painted foyer, great room, dining area, kitchen, hall & stairway, 2nd floor bathroom, also remove carpeting in great room and replace with hardwood, and install carpeting on stairway & hall, and 3 bedrooms

$10k

Normal, IL

kitchen renovation

Feb 2015

refinish cabinets, install new countertops, and install new back splash

$5k

Bloomington, IL

fireplace mantle

Feb 2015

remove panel covered mantle, cover with tile board around front & sides to accommodate stone work and install 3/4"oak top with trim, trim base tile with oak trim, and trim mantle top base with oak trim

$700

Normal, IL

bath tile

Feb 2015

tile around whirlpool tub, front of tub with ledge, access door floor, and side linen closet area

$2k

Bloomington, IL

ADA bath renovation

Feb 2015

Renovate small children's bathroom into ADA compliant bathroom. Check ADA guidelines to insure proper spacing and heights for bathroom functions. Expand existing room to allow for space. Install new toilet, sink, floor tile, walls, support bars and door.

$7k

Bloomington, IL

Hawthorne ll renovation

Aug 2007

We removed pocket doors and installed roman columns, arched the overhead to rest on the columns,installed an isle of 1" thick 18" x18" marble across the room and under the columns, also installed columns between great room and kitchen area. We covered the existing brick fireplace with tile board, tiled up to the ceiling,crowned it into the existing crown molding, covered the foot in black granite,and installed an imported marble mantle that matched with the simulated marble wall tile,installed 2 black granite tiles in the wall above the mantle which gives the impression that the chariot statute is inset in the wall. We also painted the home,installed Jacobean wood flooring in the hall&master bedroom,and marble bathroom tile.

$15k

Bloomington, IL

Basement renovation

May 2006

Completely renovate 1000 s.f. basement installing bedroom, full bathroom, entertainment area( with bar), and theatre room with platform raised seating and surround sound system

$28k

Normal, IL

Bath Renovation

Oct 2016

Master bathroom &common bathroom : built complete showers in both with mudd pan,curb,pvc liner,waterproof membrane wall covering,wall tiling,floor tiling,drains&water supply lines,clawfoot tub&faucet,toilets,and electrical work.

$14k

Goodfield, IL