iRenovate Design Build

General Contractor - Brandywine, MD

Project Gallery

A table showing the projects done by the pro

Photo

Project

Date

Description

Cost

Home

Wright Project

Dec 2018

This was a complete demolition, down to the joists. The bathroom was completely reconfigured. Toilet is where the shower was, shower is where the vanity was and the area that houses the tub was originally a closet. All permits pulled and all inspections passed. Shower glass had not arrived at the time of photos, which were taken during final inspection from PG County and WSSC.

$24k

Ft Washington, MD

Wilson Project

Mar 2018

Guest bathroom added to basement. Drains were roughed in by the home builder, and relocated (by us) to accommodate desired layout. Complete layout and design done by us. Client gave us complete autonomy over the project. We absolutely could not let them down! Custom tile work, Wrap around corner niche with remote controlled waterproof LED lighting built in. Custom shower head. Columns built on both sides of new vanity to accommodate hidden plumbing. LED light bar over vanity. Recessed lights. Custom built in candle box with remote controlled, real wax LED candles. Custom built in "linen bin". Exhaust fan with built in blue tooth speaker. It was a complete joy to create!

$25k

Waldorf, MD

K&J Project

Dec 2017

Complete gut, down to the joists. Removed tub and went back with mud bed and shower. Custom glass. All new tile work and custom niche. Custom shower system with built in jets. Added (2) small built in linen closets. Complete bathroom renovation. Exhaust fan with bluetooth speaker built in. New entrance door installed. (Note: Customer had windows on order from Lowes. Windows were not a part of our Scope of Work and were installed by Lowes after we left).

$22k

Clinton, MD

Middleton Project

Jul 2017

Complete kitchen remodel. All new cabinets, granite counter tops, back splash, stainless steel appliances, added an island, recessed lights and hardwood floor. All materials and labor were included.

$28k

Waldorf, MD

Mitchell Project

Jul 2016

Installed marble back splash. Removed existing counter top from Master Bath and installed granite slab, double vessel bowl sinks and faucets. All plumbing done by us as well. Materials and labor included.

$4k

Waldorf, MD