Miller Well Drilling

Well Service - Brasstown, NC

Average rating

info

4.48

4.5

based on 73 online reviews

Average rating

info

4.48

4.5

based on 73 online reviews
based on 73 ratings

Project Gallery

A table showing the projects done by the pro

Photo

Project

Date

Description

Cost

Home

Neighborhood Pressure Tank Rework and Well House Clean Up

Feb 2015

The neighborhood called in out of water over the weekend. We were able to give them a temporary fix and then went back out the next week to repair their pressure tanks and re-wire and clean up the well house. The original installation of the pressure tanks was in mud and the pressure tanks were deteriorating due to corrosion. Our pressure tanks are rated for up to 150PSI and have a 7 year warranty. Check out the beautiful before and after photos. This neighborhood is sure to have a long lasting water source.

$2k

Hayesville, NC

Murphy Motel Well Repair

Nov 2014

Guarranteed Water Drill Deeper/Reconstruction on existing well w/ Upgrades and Connections to existing Facilities

$15k

Murphy, NC

Big Creek Well Construction

Nov 2014

Guaranteed Water for up to 5 homes

$18k

Blue Ridge, GA

Water Filter

Oct 2014

Filter System for up to 4 ppm of iron reduction and sulfur smell/sulfur and iron bacteria removal.

$4k

Hayesville, NC

North Ridge Well Construction

Aug 2014

Guaranteed Water New Well Construction Project for up to 5 homes. 400' Deep 10 GPM w/ 15GPM Constant Pressure System.

$18k

Brasstown, NC

Cartridge Filter for Sediment and Iron

Aug 2014

Install filters for sediment and iron removal. Do 24 hour 100ppm chlorine flush through system w/ clean out water heater.

$1k

Hayesville, NC

Filter Upgrade

Aug 2014

Competitor installed the black filter (greensand plus w/ chlorination) it didnt work, the filter was plugged into a pig-tail off the pressure switch with no neutral. Miller Well Drilling rebuilt the system & installed a 120V circuit w/ isolated neutral and installed the new system on a battery back-up & added a heat tape to keep it protected from freezing in the winter weather. Water Quality Analysis Raw: Iron 6 pH 7 H 3 After Greensand: Iron 3 pH 6.5 H 1.25 After Media Filter by MWD: Iron 0.1 pH 7.3 H 3 Happy Customer!

$3k

Young Harris, GA

HIawassee Dam School

Feb 2014

Ballfield Irrigation System Booster Station from existing water supply with Water Main Installation.

$16k

Murphy, NC

Sulfur Removal Water Treatment System

Sep 2013

Competitor had installed a messy system that didn't work for approximately $3500.00. Miller Well Drilling- redesigned the system & added components removing the sulfur from the water for less than the original cost of the system,

$3k

Murphy, NC