G L KEISER CONTRACTING INC

Concrete Contractor - Chula Vista, CA

1.0

1 review

1.0

1 review

Project Gallery

A table showing the projects done by the pro

Photo

Project

Date

Description

Cost

Home

Second Story Remodel

Jun 2013

LABOR AND MATERIALS TO JACK UP SECOND STORY BALCONY AND RESET EXISTING POST. REMOVE EXISTING. LABOR AND MATERIALS TO REPAIR PLUMBING AND ADD NEW BALLCOCK VALVE.

$455

San Diego, CA

Exterior Remodel

Aug 2014

LABOR AND MATERIALS TO REMOVE EXISTING STUCCO AND WINDOWS AND HAUL. LABOR AND MATERIALS TO FORM AND POUR FOOTINGS. ALSO GRADE TO 18" CLEARANCE AND HAUL DIRT. LABOR AND MATERIALS TO FRAME SUBFLOOR, WALLS AND ROOF, INCLUDING ALL FILL AND OPENINGS.

$35k

Chula Vista, CA

B Room addition

Jul 2014

Bathroom addition

$35k

Chula Vista, CA

Chula Visa Home Remodel

Jul 2014

LABOR AND MATERIALS FOR EXCAVATION OF BACK YARD, DEMO PATIO, TRENCH FOR SEPTIC, FOUNDATION WORK. LABOR AND MATERIALS TO FRAME AND SHEET ADDITION. INCLUDES FRAMING IN NEW DOORS AND FILLING WINDOWS. LABOR AND MATERIALS FOR WIRING AND ELECTRICAL SERVICE. INCLUDES ADDING 2 NEW CIRCUITS PER PLANS.

$91k

Chula Vista, CA

Fascia Repair

Jul 2014

LABOR AND MATERIAL TO REMOVE DAMAGED SECTIONS OF RAFTER TAILS AND FASCIA AND PATCH WITH BONDO.

$400

San Diego, CA

Fascia and Paint Repair

Jan 2014

LABOR AND MATERIALS TO REPLACE EXISTING FASCIA AND PAINT NEW PT 2 X12 x 14.

$545

Imperial Beach, CA

Fence and Toilet Repair

Jan 2014

LABOR AND MATERIALS TO REMOVE EXISTING FENCE AND REPLACE WITH NEW LABOR AND MATERIALS TO REPAIR TOILET VALVE

$2k

Chula Vista, CA

Demolition

Dec 2013

LABOR AND MATERIALS TO SET KEYSTONE, EXTRA CONCRETE AND DEMO. LABOR AND MATERIALS TO ADD EXTRA CIRCUIT FOR HEATER AND ADD EXTRA LIGHTS, EXTRA FRAMING.

$6k

Chula Vista, CA

Heater and Thermostat Installed

Dec 2013

LABOR AND MATERIALS TO REPLACE THERMOSTAT AND TRANSFORMER FOR HEATER

$177

Chula Vista, CA