Creative Landscape Solutions

General Contractor - Coeur D Alene, ID

Project Gallery

A table showing the projects done by the pro

Photo

Project

Date

Description

Cost

Home

Backyard Landscape Downtown CDA

Nov 2018

We installed everything in the backyard starting with the paver patio. Then we installed 137 feet of cedar privacy fence with two gates. We needed to build a small block retaining wall in order to raise the yard and keep the fenceline straight. We then secured the corner post to the top of the wall establishing a clean and level look. Lastly we put sod down and brought in small round rock to cover everything the remaining sides of the patio.

$13k

Coeur D Alene, ID

Pink Boulder Fountian Repair and Installation

May 2018

Customer was victim of a poor and incomplete water feature installation. I completely reconstructed the basin and finished look of the water feature.

$2k

Rathdrum, ID

Zimmerman Retaining wall Reconstruction

Apr 2018

Fixed customers failed retainingwall. Even though it was originally built using freestanding courtyard style blocks, which are not recommended, the customer wished to re-use the same blocks. In doing so, we added and secured rebar anchors and geo-grid netting to help keep the wall from turning over again. We also added additional drain tile and rock behind the wall for better drainage.

$2k

Dalton Gardens, ID

Randy and Christie Oetken's Patio

Oct 2017

Installed 900+ square foot natural flagstone and custom Belgard cobblestone circular paver patio.

$11k

St Maries, ID

Tower Mountian Waterfall

Jun 2017

Customer needed his 120 foot stream/waterfall cleaned out and repaired. We added a small boulder fountain at the top in time for his wife’s birthday. We were able to locate and repair small leaks and tears in the liner and remedy the main flaws in the bottom basin at the bottom that caused major waterloss issue. Also replaced old pump with new design that increased pump lifespan and decreased operating costs. Added 12 foot long rock ledge and more dramatic waterfall spill rocks along the waterfalls path. Estimated time to complete: 1.5 weeks or about 60 hours.

$3k

Blanchard, ID