Willey Works

Remodeling Contractor - Cottage Grove, OR

Project Gallery

A table showing the projects done by the pro

Photo

Project

Date

Description

Cost

Home

Sub Floor Insulation

Dec 2013

Insulated sub floor (~800 sq. ft.).

$1k

Cottage Grove, OR

Floor Installation

Nov 2013

Installed slate floor in kitchen and bathroom.

$2k

Eugene, OR

Shelter New Construction

Oct 2013

Constructed new, elevated 5' x 8' posts and beam shelter on side of house with floor.

$1k

Eugene, OR

Whole House Interior Painting and Step Repair

Oct 2013

Painted interior of whole house and repaired steps.

$3k

Eugene, OR

Kitchen Remodel

Apr 2013

Remodeled whole kitchen that included demolition, installing new cabinets, and painting.

$3k

Cottage Grove, OR