Clear the Air

HVAC Company - Friendswood, TX

Average rating

info

4.82

4.8

based on 693 online reviews

Average rating

info

4.82

4.8

based on 693 online reviews
based on 693 ratings

Project Gallery

A table showing the projects done by the pro

Photo

Project

Date

Description

Cost

Home

Owens Corning

Jan 2014

Installation of 50 Ton Carrier unit and supply ducting for Ownes Corning shingle plant. Specific spot cooling for cooling/drying on process line.

Houston, TX

Residential Project 1

Mar 2013

Installation of Trane Gas system and XB condensing unit

Friendswood, TX

ECHO Project

Feb 2012

Scope of work: Oil Company Installation of mechanicals for a building that houses specialized electrical equipment. Redundancy required. Indoor space was a concern due to all the electrical equipment. All mechanical was speced for exterior installation. (4) 50 ton York package units and custom sheet metal.

Friendswood, TX