General Contractor - Gainesville, GA
Swank’s construction specializes in new construction and remodels. We will service a call from a new build down to a simple door swap. No job is too big or too small! *fully insured with biBerk
5 years in business
Address
Gainesville, GA 30501
Photo | Project | Date | Description | Cost | Home |
---|---|---|---|---|---|
![]() ![]() | Cabinet refinish | Oct 2021 | Sand and refinish oak cabinets with a Navy blue spray finish. | $4k | Urbana, OH |
![]() ![]() | Bathroom remodel | Aug 2021 | Flooring, trim, vanity, toilet install | $2k | Beavercreek, OH |
![]() ![]() | Custom oak floating mantle | May 2021 | Hand carved, burned and stained. | $680 | Urbana, OH |
![]() ![]() | Basement remodel | Apr 2023 | Framed out bathroom, ran all new plumbing/drains/water feeds, all new electric, drywall, and custom 7’x5’ shower, and then 400 sq ft remodel with flooring, drywall ceiling, finish drywall, paint, and set trim. | 0 | Delaware, OH |
![]() ![]() | Painting kitchen, applying finish to bifolding doors and installing them. | Aug 2021 | 2 Coats of paint on walls and ceilings. 4 coats of paint on bifolding doors. Trim out lights. | 0 | Huber Heights, OH |
![]() ![]() | Stone fireplace pop out | Aug 2021 | 5 process build, first we had to demo the wall, then we framed out our box deep enough for our fireplace insert and then we had to sheath it with 1/2” concrete board and after that came the stone and when the stone was completed, we let it sit for a week to cure 100% and then we went ahead and bracketed the tv up, hit all cords behind the wall and then cleaned up. In total 4 days. | Urbana, OH | |
![]() ![]() | Bathroom remodel | Jul 2021 | We replaced the shower pan in the shower and I’m doing so I added a mosaic tile border around shower and tub basin. After we completed the shower then I laid all new flooring with sound deadening underlayment and new trim. We then added a new vanity and shower enclosure. Took 6 days | Beavercreek, OH | |
![]() ![]() | Custom shower with galvanized metal | May 2021 | This bathroom had the shower pan set, and concrete board on the walls already. We came in and modified the plumbing to accommodate for our new shower unit. Then we taped and mudded the seams and corners of the concrete board. After this we were able to waterproof the shower with a rubberized crack isolation membrane. Then we installed inside corners with galvanized metal and hung our galvanized J-channel and proceeded to hang the sheet metal on the walls with corner trims for the shown cut edges. After that we were able to install our shower unit on the wall hooked up and job well done. 1 1/2 days to complete | 0 | Rushsylvania, OH |
Lakeview house remodel | Feb 2021 | Full house remodel, completed every task except for electrical and plumbing. | $40k | Lakeview, OH |