SafetyTech

Flooring Contractor - Garland, TX

Project Gallery

A table showing the projects done by the pro

Photo

Project

Date

Description

Cost

Home

Hotel Bathtubs - Epoxy Removal and Added Traction

Aug 2014

Removed the peeling epoxy from all bathtubs in the hotel and added traction by etching the porcelain bathtubs.

$7k

College Station, TX

Hotel Bathtubs - Etching

Jul 2014

Added traction by etching all of the hotel's porcelain bathtubs.

$3k

College Station, TX

Restaurant - Added Traction to Floor

Jun 2014

Added traction to the floors of a restaurant.

$5k

Arlington, TX

Patio Tile - NRH Home Owner

Jun 2014

Added traction to outdoor patio tile which was adjacent to a swimming pool.

$950

North Richland Hills, TX

Hotel - Rock Formation

Jun 2014

Cleaned and sealed a sandstone rock formation to significantly reduce erosion.

$375

College Station, TX

Lake House - Tile Traction

Feb 2014

Added traction to outdoor tile for lake house.

$4k

Brookeland, TX