Project Gallery

A table showing the projects done by the pro

Photo

Project

Date

Description

Cost

Home

Design and Construction

Mar 2014

Designed and built the electrical system for the entire building. Crews installed a 2000 amp, 480/277 volt system and also installed the Biomass heating system, which was added after construction was well underway.

Bismarck, ND

Commercial Electrical Design

Mar 2014

UND Town Homes. Provided a basic electrical design.

Grand Forks, ND

Wiring

Feb 2014

installed wiring for new home.

Grand Forks, ND

Smoke detectors

Feb 2014

installed smoke detectors.

Grand Forks, ND

Electrical Panel Install

Feb 2014

Installed an Electric Panel

Grand Forks, ND

Commercial Electrical Installation

Jan 2014

A 2200 amp 208 volt. Three phase service, with a 1600 amp/208 volt three phase service to handle the individual living units, and a 600 amp three phase 208 volt service for the underground parking garage and common areas. It took Bergstrom 4466 man-hours to complete the design and construction of what is considered the most luxurious living arrangements in the region.

Grand Forks, ND

Apartment Electrical Installation

Jan 2014

Installed a 1600 amp main distribution along with a 55 KW backup generator. The building's common areas were handled by three 225 amp subpanels, there was an additional 150 amp emergency power panel, and then each apartment had its own 100 amp panel. Every apartment had a heat pump in it that incorporated the geothermal field. Bergstrom also installed several VFDs (Variable Frequency Drives) on the well-field pumps that circulated the water through the building.

Belcourt, ND

Residential Electrical Installation

Jan 2014

Leviton dimming system with multiple keypad locations situated throughout the home. The electrical system was a 600 amp/240 volt single phase system with two 200 amp off-peak panels feeding the two electrical plenum heaters, electric boiler, and two heat pumps. The highly efficient heating system utilizes off-peak power to keep energy costs low.

Grand Forks, ND

Residential thermal scan

Jan 2014

thermal scan of entire home and give recommendations for home improvements.

Grand Forks, ND