Home

Bathroom Remodel

Jun 2008

Bathroom Remodel

Grove, OK

Moore Well

Jul 2014

Install new water well, pump, and pressure system.

$7k

Grove, OK

Murray Greenhouse

Jun 2014

Install new poly-carbonate panels onto greenhouse structure.

$3k

Sulphur Springs, AR

Dittmer Water

May 2014

Construct slab on grade, wood framed well water treatment structure.

$3k

Grove, OK

Moore Bath

Mar 2014

Complete remodel: Tear out existing fixtures, plumbing, sub floor and framing. Re-frame floor and walls. Rebuild sub floor, install new fixtures, tile, drywall, and paint.

$8k

Grove, OK

Ortwein Well

Mar 2014

Install new water well, pump, and pressure system.

$7k

Grove, OK

Jay Garage

Jan 2014

Two room addition to lakeside cabin, a bedroom and laundry/utility room.

$20k

Grove, OK

Cremer Remodel

Nov 2013

Remove water damaged texture on interior of house. Install custom texture to match existing texture.

$65k