Roofing Contractor - Kent, WA
Average rating
4.81
4.8
Average rating
Three Tree Roofing is a family owned and operated roofing company serving the greater Puget Sound Area. We specialize in residential, multifamily and commercial roofing. For over 15 years, we have been successfully solving both complex and straightforward roofing problems. Our dedication to customer satisfaction and providing top quality roofs has given us the opportunity to build long lasting relationships with our clients. As a knowledgeable and trusted roofing company, our clients rely on us to provide the highest quality roofing solutions for their projects.
Average rating
Kris G.
We had a leak on a very rainy night and Cj came out the next morning. He patched it up and gave us an estimate to replace 3 skylights and a new roof. The team did a great job. They were very fast, polite and respectful of our property. I highly recommend Three Tree.
Ilya S.
With CJ and Neil we already did 2 projects. One was flat roof on an 8 unit multifamily building, another one was regular shingles roof on a 7 unit building. Both time they did job in a timely manner, so my tenants almost did't even notice the construction. On a first project the flat roof was leaking, after my call CJ was able to schedule a meeting right away. I would say CJ knows all about roofs, he explained and showed us all the problems that our current roof had (rotten wood, badly connected vent, wrong slope, clogged drain and etc) and without pushing selling strategy give us all materials and prices. As soon we signed up the contract their crew went to the property and protected the roof with cover, so there is going to be no more water damage until the new roof installation. On the second project we had really bad air circulation under the roof. Because previously someone installed the second roof above the first one. So the crew with Gil & William did a great job to improve this situation, they had to open the roof in multiple spot and cut the old roof to get better air circulation and they installed ridge vent, so our moss problem gone. Also this guys give us great recommendation for our other needs. They recommended the great drain company and we did the project with them and can't be more happy with result. And we get to the best moment. The prices are the best. They just right and reasonable. Definitely will do more projects with Three Tree Roofing.
Address
19032 66th Ave S Ste C104
Kent, WA 98032
Photo | Project | Date | Description | Cost | Home |
---|---|---|---|---|---|
Fremont Flat Roof | Sep 2018 | The Fremont Castle project is a low slope roof replacement in Seattle, Washington. The old torch down material had failed and there were several leaks. We removed the torch down, plywood and insulation. New insulation, plywood and PVC was installed. We upgraded the drainage system and installed a tapper system to divert water to the drains. A new walking deck will be installed over the roofing membrane in order to enjoy the beautiful view of Seattle. Project Time Frame: 4-5 days | Seattle, WA | ||
Seattle Composition | Sep 2018 | Existing shingles were removed and new CertainTeed Landmark Georgetown Gray. | Seattle, WA | ||
Mercer Island Ceder Conversion | Sep 2018 | Cedar shake tear off, new 1/2" CDX plywood, blown in insulation done from the roof top. New gutters and custom chimney cricket was built to divert water around chimney. | Mercer Island, WA | ||
Kent Composition | Sep 2018 | Removed old leaking 3 tab shingles. Installed CertainTeed Landmark Weathered wood. Start to finish was 3 days. | Kent, WA | ||
Kent Composition | Sep 2018 | New CertainTeed Landmark Pro Weathered Wood. New Musket Brown gutters and white downspouts. Project took 3 days to complete. | Kent, WA | ||
Ambaum Apartment Building | Aug 2018 | Three Tree Roofing installed a 12,000 sq. ft. roof on an apartment home in Burien, Washington. We removed multiple layers of built up roofing and repaired any damaged plywood, framing and fascia. We then installed new WeatherBond Gray .60 Mil TPO roofing, added venting and custom edge flashings. The Ambaum Apartments' timeline was 2-3 weeks. | Burien, WA | ||
The Historic Chelsea Apartments | Aug 2018 | In July of 2018, Three Tree Roofing was awarded a contract to re-roof the Historic Chelsea Apartments with modern TPO, a 100% waterproof chemically resistant thermo-plastic membrane that has become the leading choice for low-pitched and flat roofs in Washington State. This was a challenging and rewarding roof to complete which included limited access, multiple existing layers, carpentry repairs, and a great deal of custom stucco work. We also didn’t want to disturb the residents by traveling through the inside of the building. We held an on-site safety meeting with our crew leader and constructed an external stair tower and garbage shoot. This building was built in 1906 and had several roofs added over the years. Once the old roofing was removed and the carpentry repairs were completed, we installed .60 Mil TPO membrane. The roof turned out great and most of the residents didn’t even know we were there. Clean up was done each day including a magnet sweep to pick up any nails and metal debris that might have fallen during removal process. Project time frame was 14 business days. | Seattle, WA | ||
Burien Metal, Flat and Solar Roof | Aug 2018 | Added eight skylights and two solar tubes. Installed a metal roof and TPO membrane. Worked with solar company to install all mounts necessary to install solar panels | Burien, WA | ||
Lake Washington Metal Roof | Aug 2018 | What a beautiful roof! We tore off the old torch down roof. The old material was then recycled and used to pave roads. This roof has a shared roof deck, so the inside lumber is the same lumber to which we installed the new roof. We installed a high temp ice and water shield, new insulation, new fascia board, plywood, and the new metal roof and gutters. We installed a very nice 24 gauge metal roof and new 5k aluminum gutters and downspouts. A new low energy, argon filled double pane skylight was added and the chimney was wrapped with matching metal. Project time frame was 7 business days. | Seattle, WA |