Architect - Lake Forest, CA
Average rating
5.00
5.0
Average rating
JVArchitecture works closely with the client to creatively resolve the "why" and "where"; so a contractor can readily determine the "how" and "when" of building. JVArchitecture believes in architecture as an art form derived by site specifics, program, and a command of building materials and methods. Our process oriented methodologies arrive at design solutions that uniquely respond to the client's needs and budget. Every aspect of design is balanced by over 30 years experience in the design / build industry composed of sound construction practices and innovative sustainable solutions.
Average rating
Gerry D.
John has done 2 projects for me and am totally satesfied with the end results, so much so that a third project is in the works. Very professional and looking out for my "special needs along the way. Thanks very much Mr Valle.
Rich T.
I have worked with John for at least 25 years and it has been a very successful relationship. he has done both residential and commercial projects for me.
Address
25181 Rivendell Dr
Lake Forest, CA 92630
Photo | Project | Date | Description | Cost | Home |
---|---|---|---|---|---|
Lake Forest 1st Floor Dining Room Addition | Feb 2017 | Consists of a one story dining room addition of 63 S.F. , new windows, and sliding glass door along with window replacement in remodeled kitchen. | $130k | Lake Forest, CA | |
Lake Forest 2nd Story Addition over Garage | Jun 2016 | Consisted of approximately 400 S.F. room addition over existing 2 car garage. Room addition serves as a Guest Room as well as a study and exercise room. Amenities consist of a micro kitchen with small sink, refrigerator, microwave, and Keurig coffee maker along with WiFi, and 4 plex outlets with cable. | $100k | Lake Forest, CA | |
Tucker Residence | Apr 2011 | 3 remodels, additions between 1990 to 2011 for same client which consisted of 1 & 2 story additions, kitchen enlargement, and front addition over garage. | $500k | Newport Beach, CA | |
Wine Cellar | Apr 2010 | New room addition and new underground basemetn wine cellar for 3000 wine bottles. | $950k | Huntington Beach, CA | |
Burris Racing | May 2005 | Tenant improvements and addition of new mezzanine deck offices over existing warehouse. Design/Build assist owner in design, city permits, and selection of all trades. | $750k | Huntington Beach, CA | |
LAKESIDE ADDITION | Jun 2016 | 2ND STORY ADDITION OVER EXISTING 2 CAR GARAGE; THERE BY EXPANDING EXISTING 2ND FLOOR BEDROOM; CONVERTING IT TO BOTH EXERCISE ROOM AND GUEST ROOM | $120k | Lake Forest, CA |