Remodeling Contractor - Lubbock, TX
Average rating
5.00
5.0
Average rating
Cabinets, remodeling contractor , home improvement , woodworking , flooring , ceramic tile , bathrooms , showers, kitchens , mantles , painting , texturing , drywall , framing, flooring,
Average rating
grafton l.
Unknown User
Tim can do almost anything and he does it well. We are always pleased with his work!
Gary G.
Enjoyed working with Alpine, was able to share ideas on innovative solutions for the remodel. Learned a lot on new procedures, installs & products. Was happy with the way the design aspect evolved. Feel like I got quality work for the project.
Address
Lubbock, TX 79416
Photo | Project | Date | Description | Cost | Home |
---|---|---|---|---|---|
Lubbock 85th street shower project | Sep 2014 | This Project required some tricky demo . We moved the water heater to a new closet and essentially put the shower in it's place . This included moving quite a few water supply lines as well as drains . Concrete removal was necessary and was poured to our new grade to accommodate the whirlpool tub . Electrical was also included and the new water heater closet was finished outside with texture , paint and tile wainscoting . | $7k | Lubbock, TX | |
Lubbock full renovation 54th st. | Apr 2014 | This project was a 2 bathroom, Kitchen , Dining area , Hallway renovation . We also came back and replaced all windows in this home . The master bath was totally reconfigured with the moving of plumbing , walls , water closet , and door to accommodate the owners spacial desires. The tub surround was taken out and replaced with a 3 by 5 foot stand up shower with glass doors . We constructed a custom vanity for this room as well as a custom media cabinet / linen storage . Moving on to the kitchen, we designed, constructed, installed and finished all kitchen cabinets , as well as installing all fixtures and restoring the plumbing and electrical . The ceiling in this room was removed and new drywall installed , floated , textured and painted. One remote controlled ceiling fan in this room. The guest bath was also updated with a full 3 by 5 custom shower, new vanity top , ceramic tile floor, texture and paint. In the dining room we designed and constructed a custom bar with facing to match the wainscoting . The customer wanted a small pass through above the stove top for air flow and communication with the dining area. A divider wall was removed between the living area and dining area and replaced with columns resembling the woodwork on the wainscoting and a ceiling fan . A contrasting ceramic tile was used to transition back to the carpet. The hallway flooring was replaced and some trim and paint work was done in the bedrooms. | $25k | Lubbock, TX | |
Orchard Park finish work | Oct 2013 | This was a very large property and we were among many contractors . It was our pleasure to install these cabinets ( assembled by others ) , along with the doors, drawers, pilasters , trim and mantle . Among our installs were one 12 foot hidden door cabinet , and a hidden space behind the mantle pilaster for access to the fireplace gas valve . | Lubbock, TX |